H. PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the left side panel/wall area behind the control door. In the case of 208 VAC or 240 VAC, the supply voltage must match the electric service exactly.

3.Check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.The sail switch damper assembly was installed and pre-adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.Be sure that ALL gas shutoff valves are in the open position.

6.Be sure ALL back panels (guards) and electric box covers have been replaced.

7.Check ALL service doors to assure that they are closed and secured in place.

8.Be sure the lint door is securely in place.

9.Rotate the basket (tumbler/drum) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.Check basket (tumbler) bearing setscrews to insure they are ALL tight.

IMPORTANT: It is recommended that exhaust or booster fans not be used in the exhaust ductwork system.

28

Image 32
Contents Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Reversing Timer SPIN/DWELL Adjustments Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationPage Page Page Electrical Information Electrical Requirements78 Gas Page SINGLE-PHASE 1Ø Electrical Connection Leads GroundPage Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Selection can be madeShutdown Instructions Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationReversing Timer SPIN/DWELLADJUSTMENTS OPL Dual Timer Models onlyData Label Information Data LabelSerial Number F.E. System In Action OPL Sensoractivated Fire Extinguishing F.E. SystemInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass System Reset Sensor Activated Fire Extinguishing S.A.F.E System SensorActivated Fire Extinguishing S.A.F.E. System Coin Sensor Activated Fire Extinguishing F.E. System Installation Typical water supply Optional Manual Bypass Disabled Sensor Activated Fire Extinguishing S.A.F.E. System Sensor Activated Fire Extinguishing S.A.F.E System Qty ADC113373 04/01/02-25 12/12/02-25