American Dryer Corp MDG30PCC installation manual For 110V Applications

Page 19

3.Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the installation must conform to applicable Canada Standards: Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (size per local codes) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal-to-metal connection ALL the way to the electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with a wire (size per local codes) and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

Provisions are made for ground connection in each dryer at the electrical service connection area.

4.Electrical Connections

A wiring diagram is located inside the control box for connection data.

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

IMPORTANT: A separate protected circuit must be provided to each dryer.

Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box located at the upper left area of the dryer.

For 110V Applications

Single-Phase (1ø) Electrical Connections Leads

Black

White

Green

+-

Positive

Neutral

Ground

or L2

113201 - 7

Maytag Co.

15

Image 19
Contents MDG30PCC Installation Manual MDG30PCC PH7 For Your Safety Page Table of Contents Section Safety PrecautionsMaytag Co 20.32 cm SpecificationsSpecifications Unpacking and Setting UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Multiple Dryer Common Venting Multiple Dryer Venting Vertical Electrical Requirements Electrical InformationFor 110V Applications GAS Information Type of GAS This Pipe Size Requirement Preparation for Operation and START-UP Preoperational Tests Basket Tumbler Coating Preoperational InstructionsShutdown Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsData Label Information Sectionviii Procedure for Functional Check Replacement ComponentsMaytag Co Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer Maytag Co 09/16/08