American Dryer Corp installation manual MDG30PCC Installation Manual

Page 1

MDG30PCC Installation Manual

(30 lb Single Pocket, Phase 7 Coin)

WARNING: For your safety the information in this manual must be followed to minimize the risk of fire or explosion and to prevent property damage, personal injury or death.

Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

WHAT TO DO IF YOU SMELL GAS:

Do not try to light any appliance.

Do not touch any electrical switch; do not use any phone in your building.

Clear the room, building or area of all occupants.

Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.

If you cannot reach your gas supplier, call the fire department.

Installation and service must be performed by a qualified installer, service agency or the gas supplier.

AVERTISSEMENT:Assurez-vous de bien suivre les instructions données dans cette notice pour réduire au minimum le risque d’incendie ou d’explosion ou pour éviter tout dommage matériel, toute blessure ou la mort.

Ne pas entreposer ni utiliser d’essence ni d’autres vapeurs ou liquides inflammables à proximité de cet appareil ou de tout autre appareil.

QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ:

Ne pas tenter d’allumer d’appareils.

Ne touchez à aucun interrupteur. Ne pas vous servir des téléphones se trouvant dans le bâtiment.

Évacuez la pièce, le bâtiment ou la zone.

Appelez immédiatement votre fournisseur de gaz depuis un voisin. Suivez les instructions du fournisseur.

Si vous ne pouvez rejoindre le fournisseur de gaz, appelez le service des incendies.

L’installation et l’entretien doivent être assurés par un installateur ou un service d’entretien qualifié ou par le fournisseur de gaz.

RETAIN THESE

INSTRUCTIONS IN A SAFE PLACE FOR FUTURE REFERENCE

Part No. 113201-7

Image 1
Contents MDG30PCC Installation Manual MDG30PCC PH7 For Your Safety Page Table of Contents Section Safety PrecautionsMaytag Co 20.32 cm SpecificationsSpecifications Unpacking and Setting UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Multiple Dryer Common Venting Multiple Dryer Venting Vertical Electrical Requirements Electrical InformationFor 110V Applications GAS Information Type of GAS This Pipe Size Requirement Preparation for Operation and START-UP Preoperational Tests Basket Tumbler Coating Preoperational InstructionsShutdown Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsData Label Information Sectionviii Procedure for Functional Check Replacement ComponentsMaytag Co Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer Maytag Co 09/16/08