American Dryer Corp MDG30PCC Sectionviii, Procedure for Functional Check Replacement Components

Page 32

SECTIONVIII

PROCEDURE FOR FUNCTIONAL CHECK

OF REPLACEMENT COMPONENTS

1.Microprocessor Controller (Computer) Board

a.Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer.

b.Start the drying cycle by pressing any temperature selection keys (HI, MED, or LO).

c.Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit. (Refer to the illustration below.)

28

Maytag Co.

113201 - 7

Image 32
Contents MDG30PCC Installation Manual MDG30PCC PH7 For Your Safety Page Table of Contents Safety Precautions SectionMaytag Co Specifications 20.32 cmSpecifications Installation Procedures Unpacking and Setting UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Multiple Dryer Common Venting Multiple Dryer Venting Vertical Electrical Information Electrical RequirementsFor 110V Applications GAS Information Type of GAS This Pipe Size Requirement Preparation for Operation and START-UP Preoperational Tests Preoperational Instructions Basket Tumbler CoatingShutdown Instructions Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components SectionviiiMaytag Co Dual Timer Manual Reset Burner HI-LIMIT InstructionsPhase Maytag Co 09/16/08