American Dryer Corp MLG32PD3 installation manual Electrical Information, Electrical Requirements

Page 20

F.ELECTRICAL INFORMATION

1.Electrical Requirements

It is your responsibility to have ALL electrical connections made by a properly licensed and competent electrician to assure that the electrical installation is adequate and conforms with local and state regulations or codes. In the absence of such codes, ALL electrical connections, materials, and workmanship must conform to the applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the Canadian Electrical Codes Parts 1 &2 CSA C22.1-1990 or LATEST EDITION.

IMPORTANT: Failure to comply with these codes or ordinances, or the requirements stipulated in this manual, can result in personal injury or component failure.

NOTE: Component failure due to improper installation will VOID THE WARRANTY.

A separate circuit serving each dryer must be provided. The dryer must be connected to copper wire ONLY. DO NOT use aluminum wire which could cause a fire hazard.

NOTE: The use of aluminum wire will VOID THE WARRANTY.

2.Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (per local codes) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal to metal connection ALL the way to electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

16

Image 20
Contents MLG32PD3 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Section Important InformationSafety Precautions What to do if YOU Smell GASPage Specifications GAS Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR SupplyPage Exhaust Requirements 882099 Page 882099 Electrical Information Electrical RequirementsBlack White Green Electric Service Specifications PER Tumbler GAS Information 23,940 kcal/hr Page Preparation for Operation Preoperational TestsInches Water Column 26.1 mb Shut Down Instructions Basket CoatingOperating Instructions Starting the DryerParts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Routine Maintenance CleaningVoid the Warranty Adjustments LubricationDryer Data Label Information Data Label LocationData Label Serial Number Procedure for Functional Check Replacement Components Part No 1- 11/03/00-50