American Dryer Corp MLG32PD3 installation manual Black White Green

Page 21

3.Electrical Connections

A wire diagram is located on the inside of the control (service) box for connection data.

a.Single-Phase (1ø) Hookup

The electrical connections on ALL single-phase (1ø) dryers are made into the junction box located at the upper rear of the dryer. A separate circuit servicing each dryer basket (tumbler) must be provided.

SINGLE-PHASE (1Ø) ELECTRICAL CONNECTION LEADS

Black

White

Green

+

-

 

Positive

Neutral

Ground

 

 

 

 

or

 

 

L2

 

17

Image 21
Contents MLG32PD3 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications GAS Installation Procedures UNPACKING/SETTING UPLocation of the Dryer Page Fresh AIR Supply Dryer Enclosure RequirementsPage Exhaust Requirements 882099 Page 882099 Electrical Requirements Electrical InformationBlack White Green Electric Service Specifications PER Tumbler GAS Information 23,940 kcal/hr Page Preoperational Tests Preparation for OperationInches Water Column 26.1 mb Basket Coating Shut Down InstructionsStarting the Dryer Operating InstructionsSERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Cleaning Routine MaintenanceVoid the Warranty Lubrication AdjustmentsData Label Location Dryer Data Label InformationData Label Serial Number Procedure for Functional Check Replacement Components Part No 1- 11/03/00-50