American Dryer Corp ML-96HS installation manual

Page 15

1.Leveling Dryer

To level dryer, place 4-inch square metal shims (refer to the illustration on page 10) or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear. If more headroom is needed when moving dryer into position, the top console (module) may be removed.

a. To remove top console (module).

NOTE: DO NOT have power connected when separating the top console.

1)Disconnect the ground wire at the rear of dryer.

2)Remove the six (6) sets of nuts and washers (B) holding the console (module) to base. (Located with- in control boxes)

3)Open control door and control panel then disconnect the following:

(a)On the right side box, disconnect the 4-pin and 2-pin plug. Also remove the air connection at the union.

(b)On the left side box, disconnect the drive and blower motor wires, along with the two (2) "red" and "black" wires.

4)Lift the console (module) off of the dryer base.

IMPORTANT: The dryer must be transported and handled in an upright position at all times.

11

Image 15
Contents ML-96HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationObligation Component Identification Dryer Rear View Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Create a Potential Fire Hazard Exhaust RequirementsSingle Dryer Venting Page Page Electrical Information G 9 6 H S Page GAS Information Type of GAS Piping and Connections Preparation for Operation and START-UP Supply Voltage Must Match the Electric Service ExactlyHeat Circuit Operational Test Preoperational TestsOperating Instructions Shut Down Instructions Parts ServiceWarranty Information Returning Warranty CardsReturning Warranty Parts Page Cleaning Routine MaintenanceLubrication AdjustmentsHot Surface Ignition HSI System Procedure for Functional Check Replacement Components