American Dryer Corp ML-96HS Procedure for Functional Check Replacement Components

Page 37

SECTION VII

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

Hot Surface Ignition (HSI) System

1.Upon completing installation of the replacement Hot Surface Ignition (HSI) module, reestablish power to the dryer.

2. The HSI module's "red" indicator light will light up for approximately 5-seconds (self check routine). If the HSI module's "red" indicator light stays on or flashes continuously, then the HSI module is wired incorrectly or has failed.

3. Start the drying cycle.

4. The hot surface ignitor will turn on. After approximately 4 seconds the glo-bar will shut off and the gas valve will be energized. The flame should now be established.

5. With the burner flame on, remove the flame sensor wire from the S2 terminal of the HSI

module. The burner flame must shut off immediately.

6.Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.

7.The hot surface ignitor will turn on and after approximately 4-seconds the hot surface ignitor will shut off. The gas valve will be energized and a burner flame should be evident for approximately 7-seconds and then shut off.

8.The HSI module will attempt two (2) additional ignition trails after which the HSI module will lock out and the "red" indicator light will flash continuously.

9.Functional check of the Hot Surface Ignition (HSI) module is complete. Replace the flame sensor wire from the S2 terminal to the HSI module.

33

Image 37
Contents ML-96HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationObligation Component Identification Dryer Rear View Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Create a Potential Fire Hazard Exhaust RequirementsSingle Dryer Venting Page Page Electrical Information G 9 6 H S Page GAS Information Type of GAS Piping and Connections Preparation for Operation and START-UP Supply Voltage Must Match the Electric Service ExactlyHeat Circuit Operational Test Preoperational TestsOperating Instructions Shut Down Instructions Parts ServiceReturning Warranty Cards Warranty InformationReturning Warranty Parts Page Cleaning Routine MaintenanceLubrication AdjustmentsHot Surface Ignition HSI System Procedure for Functional Check Replacement Components