American Dryer Corp ML-96HS installation manual Shut Down Instructions

Page 31

K. SHUT DOWN INSTRUCTIONS

If the dryer is to be shut down (taken out of service) for a period of time, the following must be performed:

1.Discontinue power to the dryer either at the external disconnect switch or the circuit breaker.

2.Discontinue the gas supply:

a.SHUT OFF external gas supply shut-off valve.

b.SHUT OFF internal gas supply shut-off valve located in the gas valve train area.

27

Image 31
Contents ML-96HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationObligation Component Identification Dryer Rear View Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Create a Potential Fire Hazard Exhaust RequirementsSingle Dryer Venting Page Page Electrical Information G 9 6 H S Page GAS Information Type of GAS Piping and Connections Preparation for Operation and START-UP Supply Voltage Must Match the Electric Service ExactlyHeat Circuit Operational Test Preoperational TestsOperating Instructions Shut Down Instructions Parts ServiceReturning Warranty Cards Warranty InformationReturning Warranty Parts Page Cleaning Routine MaintenanceLubrication AdjustmentsHot Surface Ignition HSI System Procedure for Functional Check Replacement Components