American Dryer Corp MDG75MNV, MDG75PNH installation manual Dryer Enclosure Requirements

Page 15

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and service above the dryer’s outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.

NOTE: Allowances must be made for the opening of the control door.

Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.57 mm) minimum allowance must be made for the opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 2 feet (0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard). Refer to the illustration above for details.

NOTE: Air considerations are important for proper and efficient operation.

IMPORTANT: Even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72 cm) or more is suggested. The additional clearance is advantageous for ease of installation and service.

IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is required. Dryers may be positioned sidewall to sidewall however, a 1/16” (1.57 mm) minimum allowance is required between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closing of the control door and the lint door.

113394 - 8

Maytag Co.

11

Image 15
Contents MDG75PNH and MDG75MNV Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Section Safety PrecautionsMaytag Co 113394 Specifications SpecificationsSpecifications Gas Component Identification Maytag Co 113394 Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsOutside Ductwork Protection Maytag Co Multiple Common Dryer Venting Importantventingreminders Electrical Requirements Electrical InformationNON-REVERSING GAS Single-Phase Electrical Lead Connections For 110V Applications GAS Information Type of GAS Maytag Co 113394 Maytag Co Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Dual Timer DryersShutdown Instructions Reversing Timer SPIN/DWELL AdjustmentsSERVICE/PARTS Information ServiceParts Routine Maintenance CleaningSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Data Label Information Sectionvii Procedure for Functional Check Replacement ComponentsMaytag Co Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer Sensoractivated Fire Extinguishing S.A.F.E. System F.E. System In ActionInstallation Typical Water Supply F.E. System Theory of Operation F.E. System Water Valve Check F.E. System Diagnostics Messages Maytag Co 10/30/08