3.Piping Connections

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional. It is important that gas pressure regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of ALL the appliance Btu being supplied.

The dryer is provided with a 3/4” N.P.T. inlet pipe connection located at the right side of the base of the dryer. The minimum pipe size (supply line) to the dryer is 3/4” diameter. For ease in servicing, the gas supply line of each dryer must have its own shutoff valve.

The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas meter or, in the case of L.P. gas, the supply tank, other gas-operated appliances on the same line, etc. Specific information regarding supply line size should be determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure, which will result in erratic operation of the burner ignition system.

24

Maytag Co.

113394 - 8

Image 28
Contents MDG75PNH and MDG75MNV Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Safety Precautions SectionMaytag Co 113394 Specifications SpecificationsSpecifications Gas Component Identification Maytag Co 113394 Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationOutside Ductwork Protection Maytag Co Multiple Common Dryer Venting Importantventingreminders Electrical Information Electrical RequirementsNON-REVERSING GAS Single-Phase Electrical Lead Connections For 110V Applications GAS Information Type of GAS Maytag Co 113394 Maytag Co Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Dual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsService SERVICE/PARTS InformationParts Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationLint Drawer Removal Data Label Information Procedure for Functional Check Replacement Components SectionviiMaytag Co Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer F.E. System In Action Sensoractivated Fire Extinguishing S.A.F.E. SystemInstallation Typical Water Supply F.E. System Theory of Operation F.E. System Water Valve Check F.E. System Diagnostics Messages Maytag Co 10/30/08