American Dryer Corp ML-55HS installation manual Black White Green Positive Neutral Ground

Page 25

Actual electrical wire connections are made to the L1 and L2 terminals of the motor contactor located in the rear service box mentioned above. The ground connection is also made to the copper lug also provided in this box.

SINGLE-PHASE (1Ø) ELECTRICAL CONNECTIONS LEADS

Black

White

Green

+

-

 

Positive

Neutral

Ground

 

or

 

 

L2

 

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

2)3-Phase (3ø) Wiring Connections/Hookup "NON-REVERSING MODELS ONLY"

The electrical connections on ALL 3-phase (3ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer. Electrical connections for electrically heated dryers are made in the electric oven area located at the upper rear area of the dryer.

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

If local codes permit, power to a gas or steam dryer can be made by the use of a flexible U.L. listed power cord/pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer.

21

Image 25
Contents ML-55HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Electric Service Relay Box Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Requirements Create a Potential Fire Hazard Exhaust RequirementsPage Page Page Electrical Information MLG-55 Gas MLS-55 Steam Page Black White Green Positive Neutral Ground Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Bars Steam System Operation Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceLubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationSerial Number P O R TA N T Manual Reset HI-LIMIT InstructionsP O RTA N T ADC 113000 9-11/23/05-0