American Dryer Corp ML-55HS installation manual Preoperational Instructions

Page 41

10.Reversing Models Only - basket (tumbler) dryer should never be operated with less than a 30 lb. (14 kg) load (dry weight). The size of the load will affect the coast-down and dwell (stop) times. The basket (tumbler) must come to a complete stop before starting in opposite direction.

a.Microprocessor Models

1)Spin and stop are not adjustable in the Automatic Mode and have been preprogrammed into the microprocessor controller (computer) for 150-seconds spin time in the forward direction, 120-seconds in the reverse direction and a 5-second dwell (stop) time.

2)Spin and stop times are adjustable in the Manual (timed) Mode.

b.Dual Timer Models

1)Both dwell (stop) time and the basket (tumbler) spin time are adjustable. (Refer to the illustration on page 47.)

11.Check to insure that ALL setscrews (i.e., basket [tumbler] drive, idler, etc.) are tight.

K.PREOPERATIONAL INSTRUCTIONS

1.To start the dryer...

a.Microprocessor Controller (Computer) Dryers

1)The light emitting diode (L.E.D.) display will read "REAdY."

2)Press the "E" on the keyboard (touch pad).

3)The dryer will start and the display will flash "dRYING MANUAL CYCLE E" "dRY TEMP 180F" "COOL TEMP 80F" "30 REMAIN" "dRUM TEMP."

Refer to the User's Manual for detailed operating instructions.

b.Dual Timer Dryers

1)Turn drying timer knob for a time of 20 minutes.

2)Select "High Temp."

3)Push "Push To Start" Switch.

4)To stop dryer, open the main door.

37

Image 41
Contents ML-55HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Electric Service Relay Box Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Requirements Create a Potential Fire Hazard Exhaust RequirementsPage Page Page Electrical Information MLG-55 Gas MLS-55 Steam Page Black White Green Positive Neutral Ground Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Bars Steam System Operation Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceLubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationSerial Number P O R TA N T Manual Reset HI-LIMIT InstructionsP O RTA N T ADC 113000 9-11/23/05-0