American Dryer Corp ML-55HS installation manual

Page 26

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left corner of the dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the service box contactor, the service box cover must be removed.

22

Image 26
Contents ML-55HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Electric Service Relay Box Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Requirements Exhaust Requirements Create a Potential Fire HazardPage Page Page Electrical Information MLG-55 Gas MLS-55 Steam Page Black White Green Positive Neutral Ground Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Bars Steam System Operation Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Page Reversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelSerial Number Manual Reset HI-LIMIT Instructions P O R TA N TP O RTA N T ADC 113000 9-11/23/05-0