American Dryer Corp AD-20 installation manual Must be Provided

Page 19

2)Electric Models ONLY

ALL electrically heated dryers must be connected to the electric service shown on the dryer’s data label, which is affixed to the upper left area of the inner back panel. The connecting wires must be properly sized to handle the rated current.

NOTE: Electrically heated service (amperage) specifications/requirements are not available at the time of printing. Contact factory for update.

NOTE: Component failure due to improper voltage application will VOID THE WARRANTY.

3.Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the installation must conform to applicable Canada Standards: Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (no. 18 minimum) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal to metal connection ALL the way to the electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

Provisions are made for ground connection in each dryer at the electrical service connection area.

4.Electrical Connections

A wiring diagram is located inside the rear electric box.

NOTE: A CIRCUIT SERVICING EACH DRYER

MUST BE PROVIDED.

The electrical input connections on ALL dryers are made into the rear service box located at the upper right area of the dryer.

15

Image 19
Contents AD-20 Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Routine Maintenance Receiving and Handling Important InformationInjury or Fire could Result Safety PrecautionsPage Specifications SpecificationsSpecifications AD-20 UNPACKING/SETTING UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Important Observe ALL governing codes and ordinances Exhaust RequirementsImportant Venting Reminders Electrical Requirements Electrical InformationMust be Provided Page Page Page AD-20 Electrical Service Specifications PER DryerGAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsShut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Createapotential Fire Hazard Data Label Data Label InformationSerial Number ADC113379 10/16/02-25 10/17/02-250 12/03/02-250
Related manuals
Manual 16 pages 36.72 Kb