American Dryer Corp AD-20 installation manual Preparation for OPERATION/START-UP

Page 28

H. PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the left side panel area behind the top control (access) door.

3.GAS MODELS - check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS AND ELECTRIC MODELS - the sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.Check bolts, nuts, screws, terminals, and fittings for tightness.

6.GAS MODELS - be sure that ALL gas shutoff valves are in the open position.

7.Check that the back guard panel and the electrical box cover have been replaced.

8.Check the lint drawer to assure that it is closed and secured in place.

IMPORTANT: If during installation the lint door safety chain was disconnected, it must be reconnected or personal injury may result.

9.Rotate the basket (tumbler/drum) by hand to be sure it moves freely.

10.Check terminals and fittings for security.

24

Image 28
Contents AD-20 Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Routine Maintenance Important Information Receiving and HandlingSafety Precautions Injury or Fire could ResultPage Specifications SpecificationsSpecifications AD-20 Installation Procedures UNPACKING/SETTING UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Important Observe ALL governing codes and ordinancesImportant Venting Reminders Electrical Information Electrical RequirementsMust be Provided Page Page Page Electrical Service Specifications PER Dryer AD-20GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyShut Down Instructions Service SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Createapotential Fire Hazard Data Label Information Data LabelSerial Number ADC113379 10/16/02-25 10/17/02-250 12/03/02-250
Related manuals
Manual 16 pages 36.72 Kb