American Dryer Corp AD-20 installation manual

Page 22

c.Electric Models Only

1)3-Phase (3ø) Wiring Connections/Hookup

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord or pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

18

Image 22
Contents AD-20 Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Routine Maintenance Important Information Receiving and HandlingSafety Precautions Injury or Fire could ResultPage Specifications SpecificationsSpecifications AD-20 Installation Procedures UNPACKING/SETTING UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Important Observe ALL governing codes and ordinancesImportant Venting Reminders Electrical Information Electrical RequirementsMust be Provided Page Page Page Electrical Service Specifications PER Dryer AD-20GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyShut Down Instructions Service SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Createapotential Fire Hazard Data Label Information Data LabelSerial Number ADC113379 10/16/02-25 10/17/02-250 12/03/02-250
Related manuals
Manual 16 pages 36.72 Kb