American Dryer Corp AD-20 installation manual Type of GAS

Page 25

2.Technical Gas Data a. Gas Specifications

 

TYPE OF GAS

 

 

NATURAL

LIQUID PROPANE

 

 

 

 

 

Manifold Pressure*

3.5 inches W.C.

8.7 mb

10.5 inches W.C.

26.1 mb

 

 

 

 

 

In-Line Pressure

6.0 - 12.0 inches W.C.

14.92 - 29.9 mb

11.0 inches W.C.

27.4 mb

 

 

 

 

 

Shaded areas are stated in metric equivalents

*Measured at outlet side of gas valve pressure tap when gas valve is on.

b.Gas Connections

Inlet connection ------------- 3/8” N.P.T.

Inlet supply size ------------- 3/8” N.P.T. (minimum) Btu/hr input (per dryer) ---- 40,000 (10,080 kcal/hr)

1)Natural Gas

Regulation is controlled by the dryer’s gas valve’s internal regulator. Incoming supply pressure must be consistent between a minimum of 6.0 inches (14.92 mb) and a maximum of 12.0 inches (29.9 mb) water column (W.C.) pressure.

2)Liquid Propane (L.P.) Gas

Dryers made for use with L.P. gas have the gas valve’s internal pressure regulator blocked open so that the gas pressure must be regulated upstream of the dryer. The pressure measured at each gas valve pressure tap must be a consistent 10.5 inches (26.1 mb) water column. There is no regulator or regulation provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank) or an external regulator must be added to each dryer.

 

 

 

 

TYPE OF GAS

 

L.P.

 

 

 

 

 

 

 

 

 

 

 

Conversion

ADC

BTU

kcal/hr

 

Natural

 

 

Liquid Propane

 

 

 

Kit

MODEL

Per Hour

 

 

 

Part

 

 

 

Part

Rating

Qty.

D.M.S.*

 

Qty.

D.M.S.*

Part Number

NUMBER

Rating

 

Number

Number

 

 

AD-20

40,000

10,080

1

#31

 

140868

2

 

#49

140869

883610

 

 

 

 

 

 

 

 

 

 

 

 

Shaded area is stated in metric equivalent

* Drill Material Size (D.M.S.) equivalents are as follows:

Natural Gas

#31 = 0.1200” (3.048 mm).

Liquid Propane Gas

#49 = 0.0730” (1.8542 mm).

21

Image 25
Contents AD-20 Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Routine Maintenance Receiving and Handling Important InformationInjury or Fire could Result Safety PrecautionsPage Specifications SpecificationsSpecifications AD-20 UNPACKING/SETTING UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Important Observe ALL governing codes and ordinances Exhaust RequirementsImportant Venting Reminders Electrical Requirements Electrical InformationMust be Provided Page Page Page AD-20 Electrical Service Specifications PER DryerGAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsShut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Createapotential Fire Hazard Data Label Data Label InformationSerial Number ADC113379 10/16/02-25 10/17/02-250 12/03/02-250
Related manuals
Manual 16 pages 36.72 Kb