Chapter 3 Maintaining the Server
Preparing for Server Component Installation
Preparing for Server Component Installation
This section describes how to prepare for component installation, and it includes the following topics:
•Required Equipment, page
•Shutting Down and Powering Off the Server, page
•Removing and Replacing the Server Top Cover, page
•Replaceable Component Locations, page
•
Required Equipment
The following equipment is used to perform the procedures in this chapter:
•Number 1
•Number 2
•Number 10 Torx screwdriver
•Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat
Shutting Down and Powering Off the Server
The server can run in two power modes:
•Main power
•Standby power
You can invoke a graceful shutdown or a hard shutdown by using either the CIMC management interface or the Power button on the front panel.
To use the Power button, follow these steps:
Step 1 Check the color of the Power Status LED (see the
•
•
Step 2 Invoke either a graceful shutdown or a hard shutdown:
Caution To avoid data loss or damage to your operating system, you should always invoke a graceful shutdown of the operating system.
•Graceful
•Emergency
Step 3 Disconnect the power cords from the power supplies in your server to completely power off the server.
Cisco UCS C420 Server Installation and Service Guide
| ||
|