Model Shipways 2021 manual Construction Stages & Table of Contents

Page 4

CONSTRUCTION STAGES & TABLE OF CONTENTS

Brief History

Cover

Introduction/Credits

Pg 3

Before You Begin

Pg 5

What You'll Need to Start Construction

Pg 6

How to Work With the Plans & Parts

Pg 6

Painting & Staining the Model

Pg 7

Stage A: Shaping the Pre-Carved Hull

Pg 8

1.

Shaping the Outside of the Hull

Pg 8

2.

Carving the Bulwarks and Deck

Pg 8

Stage B: Completing the Basic Hull

Pg 9

1.

Installing the Stem

Pg 9

2.

Installing the Rubbing Strakes

Pg 9

3.

Planking the Deck

Pg 9

4.

Installing the Bulwark Stanchions and Rails

Pg 9

Stage C: Mounting the Hull

Pg 10

Stage D: Adding the Hull Details

Pg 10

1.

Stern Grating

Pg 10

2.

Hawse Pipe Lips

Pg 10

3.

Bow Fender

Pg 10

4.

Bitts and Bow Post

Pg 10

5.

Deck Plates

Pg 10

6.

Main Cabin

Pg 10

7.

Pilot House

Pg 11

8.

Smoke Stack, Whistle and Steam Vent Pipe

Pg 11

9.

Boat and Davits

Pg 11

10.

Mast and Towing Lanterns

Pg 11

11.

Ladders

Pg 11

12.

Stowage Chests

Pg 11

13.

Rail Stanchions

Pg 12

14.

Running Lights and Eagle

Pg 12

15.

Name Boards and Lettering

Pg 12

16.

Side Fenders

Pg 12

Bibliography

Pg 13

4

Image 4
Contents Taurus Page Taurus Construction Stages & Table of Contents Before YOU Begin HOW to Work with Plans and Parts PlanKit Lumber Cast Metal FittingsPreliminaries Taurus Color SchemeShaping PRE-CARVED Hull Shaping the Outside of the HullInstalling the Stem Installing Rubbing StrakesInstalling the Bulwark Stanchions and Rails Planking the DeckMounting the Hull Pilot House Boat and DavitsLadders Stowage ChestsRail Stanchions Running Lights and EagleName Boards and Lettering Side FendersBibliography Taurus Instructions For LASER-CUT Cabin Pilot House Modelers LOG Model Shipways