Wiring to the searchlight
The
Following the wiring scheme above and Appendix C. use the supplied butt connectors to connect the Master Controller to the searchlight.
Wiring the Point Pad™
The
Wiring to the power supply
The power source must be a fused 12 VDC,
amp supply. Following the wiring scheme in Table 1, use the supplied butt connectors to connect the Master Controller to the power source. Refer to Table 2 for proper wire size for connection of the input power lines.
NOTE: As per the wiring scheme, the ORANGE wire is connected to the positive terminal and the BLUE wire is connected to the negative terminal of the power source.
CAUTION: HID light systems, when first turned on, have a high inrush current requirement of 25 amps. If you activate the light and the lamps flicker on and off repeatedly, check the voltage being supplied. This condition can be experienced with voltage input of less than 11.5V.
Functions of the URC-300
The