Interlink electronic L485SB, L485RSB, L485RSIB, L485SIB, L485RB manual Leak Testing Instructions

Page 35

35

Leak Testing Instructions

WARNING! A leak test must be performed annually and each time a cylinder is hooked up or if a part of the gas system is replaced.

Warning! Never use an open flame to check for gas leaks. Be certain no sparks or open flames are in the area while you check for leaks. Sparks or open flames will result in a fire or explosion, damage to property, serious bodily injury, or death.

Leak testing: This must be done before initial use, annually, and whenever any gas components are replaced or serviced. Do not smoke while performing this test, and remove all sources of ignition. See Leak Testing Diagram for areas to check. Turn all burner controls to the off position. Turn gas supply valve on.

Brush a half-and-half solution of liquid soap and water onto all joints and connections of the regulator, hose, manifolds and valves.

Bubbles will indicate a gas leak. Either tighten the loose joint or have the part replaced with one recommended by the Napoleon Customer Care department and have the grill inspected by a certified gas installer.

If the leak cannot be stopped, immediately shut off the gas supply, disconnect it, and have the grill inspected by a certified gas installer or dealer. Do not use the grill until the leak has been corrected.

www.ultrachefgrills.com

Image 35
Contents If YOU Smell GAS L485, L485RB, L485SB L485SIB, L485RSB, L485RSIBConditions And Limitations Ultra Chef GAS Grill Limited WarrantySafe Operating Practices Propane Cylinder Specifications Cylinder Specification/Gas Hook UpElectrical Precautions Natural Gas Hook-Up Propane Cylinder InstallationLeak Testing Instructions Control knob to the ‘off’ position Lighting InstructionsOperating The Grill Infrared Heat Replacement Screen N565-0002In. thick Infrared Grilling ChartMaintenance / Cleaning Instructions Page Troubleshooting Problem Possible Causes Solution Warranty Information Ordering Replacement PartsGetting Started Tools Required for Assembly tools not includedCaster/Bracket Installation Magnet InstallationPropane Only Propane Tank Ring InstallationLeft and Right Cart Panel Installation Ensure power bar is installed with covers to the top Transformer/Rear Cart Panel InstallationTank Inhibitor Bracket / Propane Tank Mount Installation Heat Shield Installation Front Cabinet Support InstallationTwo people are required for this step Correct Assembly Incorrect AssemblyGrill Head Installation Battery Pack / Rotisserie Mount Installation RSB Model Transformer / Rotisserie Mount Installation Rsib ModelAssembling Handles to Side Shelf Side Burner Installation Side Shelf Installation485RSB Model Bushing Cabinet Door InstallationGrids and Warming Rack Installation Sear Plate InstallationDrip Pan Installation Grease Tray and Holder InstallationRotisserie Kit Assembly Instruction Power Supply To Rotisserie Motor To Transformer Providing Power To Your Grill 485RSIB Model only Propane Only Improper Hose Connection Propane Only Proper Hose ConnectionNatural Gas Only Proper Hose Connection Natural Gas Only Improper Hose Connection Leak Testing Instructions Description Parts ListReplacement grease trays foil 5 pieces Parts Diagram 485RSB Parts List Left/right side panel cabinet enclosure Replacement grease trays foil 5 pieces 485RSB Parts Diagram 485RSIB Parts List Left/right side panel cabinet enclosure 485RSIB Parts List 485RSIB Parts Diagram Page FAX to 705 727