Desa (V)VC42PE Series installation manual Venting with Two 90 Elbows

Page 12

12

VENTING INSTALLATION INSTRUCTIONS Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise re- quirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

 

 

Horizontal (H1)

Horizontal (H1) +

 

Vertical (V)

Horizontal (H2)

45° Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

 

Horizontal (H1) +

Vertical (V)

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

www.desatech.com

116237-01C

Image 12
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationSafety Information Product Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Venting Installation Instructions Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Vertical V Horizontal H Min Max 12 max 18 max 20 maxHigh Altitude Installation Venting Installation Fireplace Installation Check GAS TypeInstalling Optional Blower Accessory Desa 5/8 Pipe & Vent KitsFireplace Installation Model BKT InstallationInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Pressure Testing Fireplace Gas Connections REMOVING/REPLACING Glass DoorRemoving Louver Panels Installing Lava Rock and Glowing Embers Cleaning Glass DoorRemoving Glass Door Installing Brick Liner Models BL42DASA and BL42DHASA Wall Switch InstallationOptional Remote Control Installation Model WRC Wiring Diagram Operating FireplaceLighting Instructions Operating Optional Blower Accessory To Turn OFF GAS To ApplianceOptional Remote OperationCleaning Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Replacement Parts Service HintsTechnical Service Parts Under WarrantySpecifications Illustrated Parts Breakdown Models VC42NE, VC42PE, VVC42NE and VVC42PEParts List KEY Part Number Description QTY2827 19 18 116237-01C KEY Part Number Description Accessories Owners Registration Form Postage Required 116237-01C Warranty Information Keep this Warranty