Desa (V)VC42PE Series installation manual Product Features, PRE-INSTALLATION Preparation

Page 4

4

PRODUCT FEATURES PRE-INSTALLATION PREPARATION

Location and Space Requirements

PRODUCT FEATURES

These are a few facts that can help you understand and enjoy your direct-vent fireplace:

The venting system may be routed to the outside of your home in several ways. It may vent through the roof (vertical) or it may vent to an outside/exterior wall (horizontal). The vent pipe instal- lation is very important to allow for proper operation. You must follow the venting instructions very carefully for either vertical or horizontal applications.

This fireplace may be installed in any room of your house provided all local codes and these installation instructions are followed.

The blower requires electricity. If you plan to install the blower at a later date, do not forget to wire the outlet at the bottom of the fireplace when framing.

Each time you turn on your fireplace, you may notice some amount of condensation on the inside of the fireplace glass. This is normal and will disappear after 10-20 minutes of operation.

Your direct-vent gas fireplace system (fireplace and venting) is a balanced and sealed gas operating unit. It requires approximately 10- 20 minutes of operating time before the flame pattern stabilizes.

If you plan on installing a television or entertainment center re- cessed above your fireplace, it is recommended that you maintain a minimum 18" above top of louver opening.

When locating termination cap, it is important to observe the minimum clearances shown in Figure 7, page 6.

If recessing into a wall, you can avoid extra framing by position- ing your fireplace against an already existing framing member.

Do not recess termination cap into a wall or siding.

You may paint the termination cap with 450ºF (232ºC) heat- resistant paint to coordinate with the exterior finish.

There must not be any obstruction such as bushes, garden sheds, fences, decks or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where excessive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termination area.

PRE-INSTALLATION

PREPARATION

LOCATION AND SPACE REQUIREMENTS

Determine the safest and most efficient location for your DESA direct-vent fireplace. Make sure that rafters and wall studs are not in the way of the venting system. Choose a location where the heat output is not affected by drafts, air conditioning ducts, windows or doors. Figure 2 shows some common locations. Be aware of all restrictions and precautions before deciding the exact location for your fireplace and termination cap.

When deciding the location of your fireplace, follow these rules:

Do not connect this fireplace venting to a chimney flue serving a separate solid-fuel burning fireplace or appliance.

Due to high temperatures, do not locate this fireplace in high traf- fic areas, windy or drafty areas or near furniture or draperies.

Proper clearances must be maintained.

If your fireplace is to be installed directly on carpeting, vinyl tile or any combustible material other than wood, it must be installed on a metal or wood panel extending the full width and depth of the fireplace. See Figure 3.

Your fireplace is designed to be used in zero clearance instal- lations. Wall or framing material can be placed directly against any exterior surface on the back, sides or top of your fireplace, except where standoff spacers are integrally attached. If standoff spacers are attached to your fireplace, these spacers can be placed directly against wall or framing material. See framing details on page 5.

Flush with a wall

Through exterior wall enclosed in a chase

Figure 2 - Common Fireplace Locations

36 1/4"

23 1/4"

48"

Figure 3 - Fireplace Bottom Dimensions

Corner installation

www.desatech.com

116237-01C

Image 4
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationSafety Information Product Identification Local CodesPRE-INSTALLATION Preparation Product FeaturesLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Venting Installation Instructions Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Vertical V Horizontal H Min Max 12 max 18 max 20 maxHigh Altitude Installation Venting Installation Fireplace Installation Check GAS TypeInstalling Optional Blower Accessory Desa 5/8 Pipe & Vent KitsFireplace Installation Model BKT InstallationBlower Wiring Diagram Installing GAS Piping to Fireplace LocationInstallation Items Needed Pressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyChecking GAS Connections REMOVING/REPLACING Glass Door Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Cleaning Glass Door Installing Lava Rock and Glowing EmbersRemoving Glass Door Wall Switch Installation Installing Brick Liner Models BL42DASA and BL42DHASAOptional Remote Control Installation Model WRC Operating Fireplace Wiring DiagramLighting Instructions Operating Optional Blower Accessory To Turn OFF GAS To ApplianceOptional Remote OperationCleaning Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Replacement Parts Service HintsTechnical Service Parts Under WarrantySpecifications Illustrated Parts Breakdown Models VC42NE, VC42PE, VVC42NE and VVC42PEParts List KEY Part Number Description QTY2827 19 18 116237-01C KEY Part Number Description Accessories Owners Registration Form Postage Required 116237-01C Warranty Information Keep this Warranty