16
VENTING INSTALLATION INSTRUCTIONS Parts List for Venting Kits and Components FIREPLACE INSTALLATION Check Gas Type Installing Optional Blower Accessory
VENTING INSTALLATION | ||
INSTRUCTIONS | ||
Continued |
| |
PARTS LIST FOR VENTING KITS AND | ||
COMPONENTS |
| |
DESA (5/8") Pipe & Vent Kits | ||
Number | Description |
|
6" Section Double Wall Pipe, Galvanized | ||
12" Section Double Wall Pipe, Galvanized | ||
24" Section Double Wall Pipe, Galvanized | ||
36" Section Double Wall Pipe, Galvanized | ||
48" Section Double Wall Pipe, Galvanized | ||
Adjustable | ||
| nized |
|
| 45° Elbow, Galvanized | |
| 90° Elbow, Galvanized | |
| Ground Floor Vent Kit, Galvanized (Includes: 45° El- | |
| bow, | |
| Square Termination, 16 Screws) | |
Basement Vent Kit, Galvanized (Includes: 45° Elbow, | ||
| ||
| Square Termination, 4' Pipe, 90° Elbow, 20 Screws) | |
Snorkel Vent Kit, Galvanized (Includes: 45° Elbow, | ||
| ||
| Termination, 4' Pipe, 1' Pipe, 90° Elbow, 26 Screws) | |
| Roof Vent Kit, Galvanized (Includes: 45° Elbow, | |
| Adjustable Pipe, Flue Restrictor, Vertical High Wind | |
| Termination, 2' Pipe, 4' Pipe, Wall Firestop, Storm | |
| Collar, Roof Flashing [0/12 - 6/12], 26 Screws) | |
Corner Vent Kit, Galvanized (Includes 45° Elbow, | ||
| ||
| Termination, 6" Pipe, 90° Elbow, 18 Screws) | |
Horizontal Round Termination Kit (Includes Round | ||
| Termination, Wall Firestop, 45° Elbow) | |
Horizontal Round Termination, Galvanized | ||
Horizontal Square Termination, Galvanized | ||
| Horizontal Square Termination Kit (Includes: Square | |
| Horizontal Square Termination, Gal- | |
| vanized |
|
Vertical Round Termination, Galvanized | ||
14" Snorkel Termination, Galvanized | ||
36" Snorkel Termination, Galvanized | ||
Storm Collar, Galvanized | ||
Wall Firestop, Galvanized | ||
Roof Flashing - 0 to 6/12 Pitch, Galvanized | ||
Roof Flashing - 6/12 to 12/12 Pitch, Galvanized | ||
Vertical Restrictor, Galvanized | ||
Vinyl Siding Standoff, Galvanized | ||
Wall Strap |
| |
Cathedral Ceiling Support | ||
Firestop Plate |
| |
Stucco Flashing - For use with |
FIREPLACE INSTALLATION CHECK GAS TYPE
Use proper gas type for the fireplace unit you are installing. If your gas supply is not correct, do not install fireplace. See retailer where you purchased the fireplace for proper fireplace according to your gas type or to purchase gas conversion kit (see Accessories, page 34).
INSTALLING OPTIONAL BLOWER
ACCESSORY
NOTICE: If installing blower in an existing fireplace with gas connections, shut off gas supply and dis- connect heater from gas supply. Contact a qualified service person to do this.
WARNING: If there is a duplex electrical outlet installed in the right side of the bottom of the fireplace base area, be sure that the electrical power to the outlet is turned off before proceeding with blower installation. Failure to do this may result in serious injury.
Model BK Installation Follow all instructions provided in the blower accessory kit.
1.Attach the power cord to the blower motor by firmly pushing the two female terminals at the end of the power cord onto the two spade terminals on the blower motor (see Figure 25).
2.Attach green ground wire from power cord to blower hous- ing using screw provided (see Figure 25). Tighten screws securely.
3.Place the blower against the lower rear wall of the firebox outer wrapper with the exhaust port directed upward. The blower will fit inside the back opening and be held in position against the back wall by the magnets (see Figure 25).
4.Be certain that all wire terminals are securely attached to ter- minals on blower motor and that the screw retaining the green ground wire is tight.
| Blower |
| Location |
| Lower Firebox |
| Cavity |
Side View | Magnetic Strips |
|
Spade Terminals | Exhaust |
| Port |
Green |
| |
Ground | Screw | |
Wire | ||
|
Figure 25 - Blower Model BK
www.desatech.com |