Desa BHDV37PC, BHDV41NC, BHDV41PC, BHDV37NC installation manual Vent Pipe Connections

Page 9

OWNER’S MANUAL

VENTING INSTALLATION

Continued

3.Attach vent pipe assembly to the fire- place. Set fireplace in front of it’s per- manent location to insure minimum clearances. Mark the wall for a 10" square hole (for noncombustible ma- terial such as masonry block or con- crete, a 7 1/2" diameter hole is accept- able). See Figure 12. The center of the hole should line up with the center- line of the horizontal rigid vent pipe. Cut a 10"x10" (254mm x 254mm) square hole through combustible ex- terior wall (7 1/2" [190mm] diameter hole if noncombustible). Frame as nec- essary (see Figure 12).

 

4" Clamp

Female

7" Clamp

Locking

 

Lugs

 

 

Spacer

 

Spring

Male

4" Flex

Pipe

Slots

 

 

7" Flex

 

Pipe

Rigid Vent Pipe Flexible Vent Pipe

Figure 11 - Vent Pipe Connections

Vent Opening

Combustible Wall

10"

(254mm)

10"

(254mm)

(Framing

4.Apply a bead of non-hardening mastic around the outside edge of the vent cap. Position the vent cap in the center of the 7 1/2" or 10" hole on the exterior wall with the arrow on the vent cap pointing up. Insure proper clearance of 1" to combustibles is maintained. At- tach the vent cap with four wood screws supplied (see Figure 13). Note: Re- place the wood screws with appropri- ate fasteners for stucco, brick, concrete, or other types of siding.

WARNING: Do not recess vent termination in to any wall. This will cause a fire hazard.

For vinyl siding use vinyl siding stand- offs between vent cap and exterior wall. The vinyl siding standoff prevents ex- cessive heat from melting the vinyl sid- ing material. Bolt the vent cap to the standoff. Apply non-hardening mastic around outside edge of the standoff in- stead of the vent cap assembly. Use wood screws provided to attach the standoff. See Figure 14.

5.Slide the wall thimble over the vent pipe before connecting the horizontal run to the vent cap (see Figure 15).

Apply Mastic to All Four Sides

UP

Wood

Screw

Vent Cap

Figure 13 - Installing Horizontal Vent Cap

6.Carefully move the fireplace with vent assembly attached toward the wall and insert the vent pipe into the horizontal termination. The pipe overlap should be a minimum of 1 1/4". Apply silicone to the outer pipe connection. Fasten all vent connections with screws provided. Refer to Fireplace Installation on page 16 for instructions on securing unit to framing or floor.

7.Slide the wall thimble against the inte- rior wall surface and attach with screws provided (see Figure 15).

Cut Vinyl Siding

Away to Fit

Standoff

Wood Screw

Standoff

UP

Nut

Bolt

Apply Mastic

to All Four Sides Vent Cap

Figure 14 - Installing Vinyl Siding Standoff

Interior Wall

Surface

Wall

Thimble

Vent Cap

Vent Opening

Detail)

(Horizontal

Screw

 

Noncombustible Wall

7 1/2" (190mm)

Figure 12 - Vent Opening Requirements

Termination)

Horizontal

 

Vent Pipe

Figure 15 - Connecting Vent Cap with Horizontal Vent Pipe

Continued

106517

9

Image 9
Contents For Your Safety For Your Safety What to do if YOU Smell GASBHDV37NC, BHDV37PC BHDV41NC, and BHDV41PC DIRECT-VENT Fireplace NATURAL/PROPANE/LP Safety InformationProduct Identification Product FeaturesGlossary Terms Local CodesClearances PRE-INSTALLATION PreparationLocation and Space Requirements Framing and FinishingLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Parts Lists for Venting InstallationVenting High AltitudeInstalling Optional Blower Accessory Fireplace InstallationInstalling GA3700/DA3610TA Blowers Check GAS TypeSide View Installation Items Needed Installing GAS Piping to Fireplace LocationConnecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Close equipment shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsInstalling Optional Wall Mount Switch GWMS2 Installing Optional Wall Mounted Thermostat GWMT1Removing/Replacing Glass Door REMOVING/REPLACING Glass DoorInstalling Left Side Brick Panel Installing Optional Brick Liner D8037A/D8041Installing Log No Installing LOGS, Lava Rock and Glowing EmbersOperating Fireplace Operating Optional Blower Accessory Ghrc Series OperationGhrcta Series Operation Pilot Assembly Operating Optional GWMS2 Wall Mounted SwitchInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Technical Service Replacement PartsWiring Diagram Service HintsBHDV37NC BHDV37PC BHDV41NC BHDV41PC SpecificationsBHDV37NC BHDV41NC36 Illustrated Parts BreakdownDIRECT-VENT Fireplace BHDV37NC BHDV41NC Parts ListBHDV37PC BHDV41PC36 DIRECT-VENT Fireplace BHDV37PC BHDV41PC Accessories GM103U41 Cabinet Mantel with Square LEG Styling Unfinished GM501U37Warranty Information