Desa VC42P SERIES, VC42N SERIES Installation Planning, Horizontal Termination Installation

Page 8

8

VENTING INSTALLATION INSTRUCTIONS

Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations require only in- ner portion of wall firestop. Horizontal installations using round termination require exterior portion of wall firestop (see Figure 14, page 10).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final venting connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your instal- lation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Male

Female Slots

Locking

Lugs

Figure 8 - Vent Pipe Connections

 

 

 

Vent Opening

 

 

 

 

 

 

 

Combustible Wall

10

3

/4" Inside Framing

 

 

 

 

3

 

 

 

 

 

 

10

/4"

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

10

3

/4"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

 

 

(Framing

 

 

Vent Opening

 

Detail)

 

 

 

 

 

 

 

Noncombustible Wall

 

 

 

 

8

1

/2"

 

 

 

 

 

 

 

 

 

 

 

 

 

(216 mm)

 

 

 

 

 

 

Center

of Hole

Figure 9 - Vent Opening Requirements

www.desatech.com

116236-01A

Image 8
Contents Save this manual for future reference For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Horizontal Termination Configurations Vertical Horizontal HCorner Installation Horizontal System Installation Using TWO Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowHigh Altitude Installation Vertical VentingVenting Installation Fireplace InstallationInstalling Optional Blower Accessories Check GAS TypeModel BKT Installation Blower see FigureInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Or servicing. Correct all leaks at once Connecting Fireplace to GAS SupplyChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Installing Remote ReceiverREMOVING/REPLACING Glass Door Removing Glass Doors Installing Lava Rock and Glowing EmbersCleaning Glass Door Installing Brick Liner Models BL42DASA and BL42 Dhasa For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsManual Lighting Procedure To Turn OFF GASTo Appliance Optional HAND-HELD Remote OperationSafety Features Manual ModeAuto Thermostatic Mode ON/OFF Series Model GhrcbOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyBrick Liner Models BL42DASA Gas leak. See Warning statement AboveReplacement Parts Service HintsTechnical Service SpecificationsIllustrated Parts Breakdown Models VC42N, VC42P, VVC42N and VVC42P SeriesParts List KEY Part Number Description QTY19 18 Parts List Accessories Owners Registration Form Postage Required 116236-01A Warranty Information

VC42N SERIES, VC42P SERIES specifications

Desa VC42P SERIES and VC42N SERIES represent a significant evolution in the realm of heating technology, particularly in the context of modern residential and commercial applications. Designed for efficiency, these products integrate advanced features and innovative technologies that cater to the diverse needs of users seeking reliable heating solutions.

One of the main features of the VC42P SERIES is its high-efficiency performance, achieving exceptional heating output while minimizing energy consumption. This is largely due to its advanced combustion technology, which ensures thorough fuel utilization and significantly reduces emissions. The VC42N SERIES, on the other hand, emphasizes versatile applications, providing a flexible heating option suitable for various environments, including garages, workshops, and large living spaces.

Both series are designed with user-friendly controls, allowing for precise temperature adjustments and easy operation. The intuitive digital thermostat enhances the user experience, enabling personalized comfort settings. In addition, the units come equipped with a built-in timer for programmable heating schedules, promoting energy savings by allowing users to heat spaces only when needed.

Another notable characteristic of the Desa VC42P and VC42N SERIES is their robust construction and durability. Built with high-quality materials, these heaters are designed to withstand everyday wear and tear, ensuring long-lasting performance. This makes them ideal for both residential and commercial use, where reliability is paramount.

The technology behind these heaters also includes safety features such as tip-over protection and overheat sensors, which automatically shut off the unit in unsafe conditions. This not only protects the heater but also contributes to peace of mind for the user, especially in environments with children or pets.

In terms of design, both series boast sleek and modern aesthetics, seamlessly integrating into various interior styles. Their compact size allows for easy placement in different spaces without compromising on heating performance.

Overall, the Desa VC42P SERIES and VC42N SERIES reflect a commitment to innovative heating solutions, blending efficiency, safety, and user-centric design. These heaters not only provide effective warmth but also contribute to reducing environmental impact, making them an excellent choice for environmentally conscious consumers. Whether for daily comfort or specific project needs, these series are engineered to meet and exceed expectations, setting a new standard in heating technology.