Cal Flame Barbecue Island manual Rock / Stone Application

Page 9

Rock / Stone Application

1.Place the island sections together on the ground.

2.Make sure the ground where the barbecue is place is as level as possible for best alignment.

NOTE: If the ground is not level, use shims to level out the island sec- tions. This needs to be done before you place the bolts.

3.Connect the speak- ers, lights, and main power cables before sliding the sections together.

4.Insert the bolts through the pre- drilled holes from the inside of the barbecue island (to- tal of four bolts on each side). Tighten all bolts using a 9/16” wrench.

5.Prepare mortar in a container.

6.Apply mortar to the gaps left open between the island assembly (front and back).

7.Let it dry for 15 to 30 minutes and brush the area where the mortar mix was applied.

8.Prepare grout in a second container.

2009 Barbecue Islands

7

Installation / Assembly

LTR2009103, Rev. A

www.calspas.com

Image 9
Contents LTR20091036, Rev. a 12/16/08 Barbecue Island Assembly Cleaning and MaintenanceWarranty Safety Instructions Placement and LocationSet-Up Operation Barbecue Islands Maintenance and Repair Precautions Regarding Children Storage Unit Attachment Barbecue Island AssemblyStucco and Tile Application Rock / Stone Application Installation Assembly Sapphire Giallo New Vene Uba Tuba Brown Granite Kit InstructionsGriddle and Griddle Storage LED Lights Light Switch InstallationAbout Natural Stone Cleaning and MaintenanceDo’s Granite TopDon’ts Scratches and ChipsTile CleaningCare Stain Removal GuideDO’s and DON’Ts of Tile Care Care and Maintenance of Tile GroutSynthetic Panel Warranty Manufacturer WarrantyWarranty Performance Warranty Limitations Customer Service DisclaimersLegal Remedies What To Do If You Smell Gas Barbecue Islands LTR20091038, Rev. a 12/16/08