![](/images/new-backgrounds/1325760/32576035x1.webp)
ASSEMBLY
•Place bottom shelf between side panels with cut out hole for LP cylinder on left. Attach to left and right side panels with (4)
1
flange nuts at rear.
For Front Door
Brace Assembly
Left Side Panel
Right Side Panel
1/4-20x2-3/8"
Front
Rear
Bottom Shelf
Machine Screw
Qty. 6
Flange Nut
Qty. 6
•Place lower back panel between side panels as shown. Attach to left and right side panels with #8x3/8” sheet metal screws. Then
2attach to bottom shelf with #8x3/8” sheet metal screws.
Left Side Panel
Lower Back Panel
#8x3/8"
Sheet Metal Screws
Qty. 6
Bottom Shelf
Right Side Panel
Magnet Assembly
18