Weber S-440, Built-In LP Gas Grill manual General Instructions, Locating Your LP Tank Enclosure KIT

Page 23

GENERAL INSTRUCTIONS

23

 

 

DANGER

Use of any other hose and regulator assembly could be dangerous, and may not provide adequate gas supply to the Summit® Built-In gas grill, and could result in a fire or an explosion causing serious bodily injury or death and damage to property.

DANGER

Failure to use the the Summit® Built-In Tank Cabinet for a 20 lb cylinder or failure to build a LP cylinder enclosure for a 20 lb cylinder following the requirements for ventilation, cylinder retention and separation of the LP cylinder from a heat source, listed in the ANSI Standard for Outdoor Cooking Gas Appliances, ANSI Z21.58 CSA 1.6, could be dangerous, and could result in a fire or an explosion causing serious bodily injury or death and damage to property.

If you do not follow the DANGER statements exactly, the Warranty on the Summit® Built-In gas grill will be voided.

LOCATING YOUR LP TANK ENCLOSURE KIT

When determining a suitable location for your LP Tank Enclosure Kit installation, give attention to concerns such as proximity to traffi c paths, and keeping any gas supply lines as short as possible. Never locate the Summit® LP Tank Enclosure Kit in a garage, breezeway, shed, under an unprotected overhang, or other enclosed area. Locate the LP Tank Enclosure Kit and structure so there is enough room to safely evacuate the area in case of a fi re.

c.

1

b.

 

 

1

 

 

 

 

 

1

 

 

b.

 

 

 

 

a.

ENCLOSURE CHART

124˝ inches (610 mm) Any Surface

aLP Tank Enlosure

bAny Surface

cNon-Combustible Surface

CLEARANCE FROM COMBUSTIBLE SURFACES OR STRUCTURES

WARNING: Clearance from the outside walls of the sides and back of the LP Tank Enclosure must be a minimum of 24" (60.96cm) any surface. Refer to “Typical Gas Supply Installation” before starting installation.

WARNING: The structure, “island” counter tops and adjacent work areas for the LP Tank Enclosure must be built from noncombustible materials only.

NOTE: If you have questions on what materials are considered noncombustible, contact you local building supplier or fire department.

WWW.WEBER.COM®

Image 23
Contents GAS Grill Clearance from Surfaces or Structures BUILT-IN Cutout Dimensions2WARNINGS Locating Your GrillGeneral Construction Details Tolerances640 Parts List440 640 Assembly ASSEMBLY7 8ASSEMBLY Assembly Inch overhang. Notch front edge for frame to fully slide 6.35 mm Drill Bit ASSEMBLY1112ASSEMBLY ASSEMBLY13 S440 S640 S440 Assembly S440 S640 440 ASSEMBLY19 Silver Gold Tolerances General Specifications for Piping Dimensions GAS SupplyTest Connections Typical 20 LP Propane GAS Supply InstallationGAS Line Piping Operating BUILT-IN Tank Enclosure InstructionsClearance from Combustible Surfaces or Structures General InstructionsLocating Your LP Tank Enclosure KIT Parts List Parts List / AssemblyMounting the LP Tank Bracket ASSEMBLY25Connect GAS Supply Connection ChartVentilation WEBER-STEPHEN Products CO
Related manuals
Manual 28 pages 18.21 Kb