Weber 520 Gas line piping, Test connections, Typical natural gas supply installation. Figure

Page 13

Typical natural gas supply installation. Figure 11.

Gas supply

Inside wall

Outside wall

Shut off

To barbecue

 

Quick disconnect

Male fitting

Locking

shut off

 

The quick disconnect is installed above ground

Figure 11

Install gas supply (continued)

Pipe compound should be used which is resistant to the action of natural gas when NPT connections are made.

The outdoor connector must be firmly attached to rigid, permanent construction.

Gas line piping

If the length of line required does not exceed 50 feet, use a 5/8" O.D. tube. One size larger should be used for lengths greater than 50 feet.

Gas piping may be copper tubing, type K or L; polyethylene plastic tube, with a minimum wall thickness of .062 inch; or standard weight (schedule 40) steel or wrought iron pipe.

Copper tubing must be tin-lined if the gas contains more than 0.3 grams of hydrogen sulfide per 100 cubic feet of gas.

Plastic tubing is suitable only for outdoor, underground use.

Gas piping in contact with earth, or any other material which may corrode the piping, must be protected against corrosion in an approved manner.

Underground piping must have a minimum of 18" cover.

Test connections

All connections and joints must be thoroughly tested for leaks in accordance with local codes and all listed procedures in the latest edition of ANSI Z223.1.

mDANGER

Do not use an open flame to check for gas leaks. Be sure there are no sparks or open flames in the area while you check for gas leaks. This will result in a fire or explosion which can cause serious bodily injury or death, and damage to property.

13

Image 13
Contents Skyline LP GAS Units only MDANGER MWARNINGSWarranty Patents and Trademarks Contents Gas supply testing For Installation in CanadaGeneral Instructions StorageCheck package contents AssemblyStep Check contents of hardware packs Assemble top frame Assemble wheel frameInstall tubing plugs Continue frame assemblyAdd front panel Add cooking box Install frame connector Install manifold bracketInstall gas supply General Specifications for PipingGas line piping Typical natural gas supply installation. FigureTest connections Check that all burner valves are off Install igniterMWARNING Do not ignite burners while leak checking Check for gas leaksInstall the bottom tray Install Flavorizer Bars and Cooking GratesMCAUTION Do not line bottom tray with aluminum foil Add tool holders, control panel and burner control knobs Install LidComplete accessory installation To Extinguish LightingManual Lighting Cooking Periodic CleaningStorage and/or Nonuse PreheatingInspection and Cleaning of the Weber Spider Stopper Guards Annual MaintenanceMain Burner Cleaning Procedure General MaintenanceMCAUTION Do not enlarge the burner ports when cleaning Weber Spider Stopper GuardsTo reinstall the burners, reverse steps c through g Crossover Ignition System Operations MCAUTION Do not line the bottom tray with aluminum foil Burner does not light, or flame is low in High positionPage 12-13 Parts List Page Page Final Word Thanks