Weber
500 Series
owner manual
Install
Parts list
Warranty
Maintenance
Continue frame assembly
Periodic Cleaning
Page 31
Page 30
Page 32
Image 31
Page 30
Page 32
Contents
Spirit 500 Series
LP GAS Units only
MDANGER MWARNINGS
Warranty
Patents and Trademarks
Contents
Storage
For Installation in Canada
Gas supply testing
General Instructions
Check package contents
Assembly
Step
Check contents of hardware packs
Assemble top frame
Assemble wheel frame
Install tubing plugs
Continue frame assembly
Add front panel
Add cooking box
General Specifications for Piping
Install manifold bracket
Install frame connector
Install gas supply
Gas line piping
Typical natural gas supply installation. Figure
Test connections
Connect flexible hose to manifold
Install igniter Check that all burner valves are off
MWARNING Do not ignite burners while leak checking
Check for gas leaks
Install the bottom tray
Install Flavorizer Bars and Cooking Grates
Allowing grease to flow into the catch pan
Add tool holders, control panel and burner control knobs
Install Lid
Complete accessory installation
To Extinguish
Lighting
Manual Lighting
Preheating
Periodic Cleaning
Cooking
Storage and/or Nonuse
Inspection and Cleaning of the Weber Spider Stopper Guards
Annual Maintenance
Main Burner Flame Pattern
General Maintenance
MCAUTION Do not enlarge the burner ports when cleaning
Weber Spider Stopper Guards
To reinstall the burners, reverse steps c through g
Crossover Ignition System Operations
Burner does not light, or flame is low in High
Conjunction with the smell of gas
Position
Page
11-12
Parts List
Page
Page
Final Word Thanks
Related manuals
Manual
36 pages
58.81 Kb
Related pages
What is included in the
Jura Impressa E40 instructions
?
Top
Page
Image
Contents