
Assembly
Step 1
Tools needed
Hammer
Check package contents
Phillips screwdriver
Cooking box (assembly)
7/16 and 3/4 inch 
| Pliers | Lid | 
| 
 | |
| 
 | (assembly) | 
| 
 | ® | 
| 
 | ® | 
| Block of wood | 
 | 
Supplies needed
You will need a soap and water solution to check for gas leaks. (See Step "Check for gas leaks.")
Note - The hardware size of nuts, bolts and screws is given. For example 
While we give much attention to our products, unfortunately an occasional error may occur. If a part is missing, do not go back to the store. Call the W eber Customer Service Center toll free 
Hose
Bottom tray
Two cooking grates
Control panel
Molded work table
Five Flavorizer Bars
7