Weber 475, 675 manual Reinstall Burner Control Knobs, Install Tool Holders

Page 15

REINSTALL BURNER CONTROL KNOBS

You will need: four (Summit 475) or six (Summit 675) burner control knobs.

Push on the burner control knobs. Figure 27.

INSTALL TOOL HOLDERS

You will need: four tool holders.

Place the tool holder under the control panel and over the front panel on the right side. Figure 28 (a). Set the tool holder on top of the front panel and slide it to the left.

To regulator

To regulator

a)

Figure 27

Figure 28

REFER TO OPERATING

GUIDE BEFORE LIGHTING

BARBECUE

15

Image 15
Contents Summit 475 Install GAS Supply Read Carefully Before InstallationLocating Your Barbecue BUILT-IN Construction General InformationBUILT-IN Structure Sleeve Dimensions BUILT-IN Structure Cutout DimensionsBUILT-IN Sleeve GAS Line Locations BUILT-IN Sleeve GAS Line LocationsSupplies Needed Remove Packaged ContentsMount Regulator Bracket ADD Cooking ModuleConnect GAS Supply to Regulator Install Flavorizer BarsADD Cooking Grates Install STEAM-N-CHIPS SmokerInstall Burner Control Knobs Install WARM-UP BasketInstall Bottom Tray Check for GAS Leaks Manifold Reinstall Control Panel Reinstall Front PanelReinstall Burner Control Knobs Install Tool HoldersRefer to Operating Guide Before Lighting Barbecue