VXI Technology, Inc.
RACK MOUNT KIT INSTALLATION
The rack mount kit (Option 59) provides the basic hardware necessary to rack mount the
REQUIRED TOOLS
1.#2 Phillips Screwdriver
PARTS LIST
QTY | ITEM | VTI P/N |
4 | Screw, | |
1 | Bracket, Rack Flange w/ hinge mounting holes | |
1 | Bracket, Rack Flange |
ASSEMBLY PROCEDURE
1.Remove the four (4) black plastic feet from the bottom of the chassis.
2.Lay the chassis on a protected work surface on its long side with the voltage monitor LEDs of the chassis facing front with the power switch toward the top.
3.Locate and remove four black plastic feet on the side of the chassis and four black plastic feet on the bottom of the chassis. Retain the feet if restoring the chassis to its original portable use is anticipated.
4.Find two threaded holes on each side of the chassis (the plastic feet were attached to two of these holes) towards the front of the unit.
5.Line up the rack mount ears with the threaded holes selecting the flush or recessed position as desired. Refer to the rack mount ear installation diagram for visual assistance.
6.Secure the rack ears using the supplied
Before installing the chassis into an EIA switch rack, the chassis handle should be removed. This can be done by doing the following:
1.Remove the four screws located near the handle.
2.Remove the two black decorative covers at each end of the carrying handle using the flat blade screwdriver. Place a piece of paper under the screwdriver blade to prevent scratching the chassis cover.
3.Remove the four Phillips screws holding the handle in place and then remove the handle itself. Retain the carrying handle components if there may be some need to restore the chassis to its original portable use in the future.
22 |