Roof Outer
Replacement
Installation Procedure
1.Drill 8 mm (5/16 in.) plug weld holes as necessary in locations noted from the original panel.
IMPORTANT: In any area damaged beyond recognition, space plug weld holes every 40 mm
2.Prepare all attachment surfaces as necessary.
3.Apply
4.Position the roof panel.
5.Plug weld accordingly.
6.Clean and prepare all welded surfaces.
IMPORTANT: Prior to refinishing, refer to publication
7.Apply the following as necessary:
•An
•Sound deadeners
•Sealers
8.Refinish as necessary.
9.Install all related panels and components.