Graham Field lf 1031 user manual Assembly, Base and mast assembly

Page 9

ASSEMBLY

Base and mast assembly

1.Remove the locking pin from the mast sleeve located on the rear of the base.

remove locking pin

2. Install the L-inserts in the base.

install L-inserts

3.With the boom pointed in the same direction as the base legs, insert the mast into the sleeve.

4.Insert the locking pin through the holes of the sleeve and mast.

install locking pin

5.Secure the locking pin by attaching the locking cable to the other end of the locking pin.

secure locking pin

6.Screw the two mast attachment bolts into the holes in the sleeve of the base.

7.Use the supplied hex wrench to tighten the bolts.

install mast bolts

LF1031-INS-LAB-RevD12

9

Image 9
Contents LF1031-INS-LAB-RevD12 GF Health Products, Inc Contents Introduction Safety Precautions LF1031-INS-LAB-RevD12 Features Shipping and Transportation Instructions Handling ProceduresUnpacking InspectionComponents Assembly InstructionsBase and mast assembly AssemblyLF1031-INS-LAB-RevD12 Power bracket Components LF1041 only attachingActuator / motor LF1041 only electrical power connections LF1041 only control box power switch emergency stop button LF1041 only charging the batteryOperating Instructions LF1041 only Emergency ProceduresLift Operation Patient Transfer Lifting the patient from a bedLowering the patient onto a bed Lowering the patient to the floor Lifting the patient from the floorRemoving the sling Battery Care and MaintenanceBefore Each USE LubricationCleaning Checking for Damage and WearCare of Slings Removal of Existing Pump LF1031 only Installation of 1010S005 Hydraulic PumpInstallation of New Pump Maintenance Schedule LF1031 Hydraulic Patient Lift Symptom Possible Cause Action TroubleshootingSpecifications Limited Warranty GF Health Products, Inc. Graham-Field Index