Braun Series A5 service manual Platform Fold Pressure Adjustment

Page 7

Platform Fold Pressure Adjustment

1.Position the platform at the floor level loading position.

2.Loosen the hex nut on the adjustment screw (do not remove hex nut).

3.Turn the adjustment screw counter clockwise until the platform does not fold when the Fold button is pressed.

4.Turn the adjustment screw clockwise in 1/4 turn increments and press the Fold button until the plat- form folds completely (Note: Return the platform to floor level position after each attempt to fold the platform).

5.Turn the adjustment screw an additional 1/8 turn after the platform folds successfully.

6.Tighten the hex nut without moving the adjustment screw.

7.Verify the platform will not stow while occupied.

Platform Fold

Adjustment

Allen Screw

Note: Secure adjustment screw and tighten hex nut following adjustment.

DO NOT adjust this valve!

(located beside solenoid valves)

Page 5

Image 7
Contents CKA Congratulations Warranty and Registration InstructionsContents Lift Terminology Switch and Sensor Locations Certification Checklist Diagnostic Procedures Platform Fold Pressure Adjustment Millennium NL Series Platform Angle AdjustmentCentury NCL Series Vista NVL Series Platform Stop Blocks Platform Floor Level Adjustment Bridging Microswitch Bridging Microswitch AdjustmentAdjustment Guidelines LCD Lift Codes Troubleshooting ProceduresFlashing Numbers Non-Flashing NumbersLubrication Diagram Maintenance and LubricationCycles Maintenance and Lubrication Schedule1500 Cycles 1500 Consecutive 750Cycle Intervals Lift Electrical Schematic Unfold Lift Wiring DiagramDescription Symbol Hydraulic SchematicQty Description Hydraulics Parts ListHydraulics Diagram Part Numbers of Items Dedicated per Lift Model Pump Module Parts ListPump Mounting Bolts Pump Module DiagramRepair Parts List Exploded View This page intentionally left blank Providing Access to the World CKA