Braun 6 manual Wheelchair-Equipped Occupant Seat Belts, Operation Procedure Review

Page 27

Pre-Lift Operation Notes and Details

Wheelchair-Equipped

Occupant Seat Belts

The Braun Corporation recom- mends wheelchair passengers position and buckle their wheel-

WARNING

Position and secure (buckle, engage, fasten, etc.) the wheelchair-equipped occupant seat belt before loading onto the wheelchair lift platform. Failure to do so may result in serious bodily injury and/or property damage.

chair-equipped seat belt (torso restraint) before loading onto a wheelchair lift.

Different types of disabilities require different types of wheel- chairs and different types of wheelchair-equipped occupant restraint belt systems (torso restraints). It is the responsibility of the wheelchair passenger to have his or her wheelchair equipped with an occupant restraint (seat belt) under the direction of their health care professional.

Wheelchair lift attendants should be instructed on any special needs and/or procedures re- quired for safe transport of wheelchair passengers.

Operation Procedure Review

The Braun Corporation recom- mends that transit agency super- visors and wheelchair lift atten- dants review the safety precau- tions and operation procedures appearing in this manual and on lift-posted decals with your wheelchair lift sales representa- tive (dealer), before attempting lift operation.

Any questions or concerns can be answered by the sales represen- tative at that time. Operate the lift through all functions with your sales representative on hand to ensure the proper use and operation of the wheelchair lift is understood.

Page 25

Image 27
Contents Series Congratulations Contents Introduction Lift TerminologyLift Components Hand-Held Switch Control BoxRegarding Lift-Titelatches are provided on pages 15 Fold switch is pressed Automatic IllustrationFixed Inboard Safety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions Lift Operation Safety Within the lift occupant area and clear of moving parts Lift Operation Safety Pre-Lift Operation Notes and Details Down Lift Control SwitchesLift Features Disengaged Lift-Tite Latch Engagement Pin Roller Pre-Lift Operation Notes and Details Fully Folded Fully Unfolded Vertical Stop non-IB Fully-Folded Disengaged Roll Stop Pre-Lift Operation Notes and Details Lift Passengers Pre-Lift Operation Notes and Details Pre-Lift Operation Notes and Details Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewPreventive Maintenance Lift Operating Instructions To Unload Passenger Lift Operating Instructions To Load Passenger Close Doors Manual Operating Instructions Follow all Lift Operation Safety PrecautionsTo Lower Platform Down To Unfold Roll Stop To Unfold Platform OutTo Fold Roll Stop To Raise PlatformTo Fold Platform Decals Decals and AntiskidBefore posting decals Available Antiskid AntiskidMaintenance and Lubrication Independent Bridge Plate non-IB Pivot Points Places Cylinder Code Warranty and Registration InstructionsWarranty and Registration Instructions Providing Access to the World ADA