Keating Of Chicago 2000 warranty Keating Electronic Timer HOW to Program the Keating

Page 12

REQUIRED TEST EQUIPMENT:

Multimeter (for testing continuity)

CHECKING CONTINUITY WITH THE MULTIMETER

1.Rotate the thermostat shaft until an audible click is heard.

2.Rotate the thermostat shaft left and right ten times causing the switch to click on and off ten times, while using the Multimeter to verify continuity.

3.If the switch does not show continuity during all ten trials, replace the thermostat.

WARNING

Disassembling the thermostat will void the ther- mostat warranty.

1.Set compression ring onto capillary end of bulb finger tight, 1/2” from end of capillary.

2.Insert new thermostat bulb through control panel back.

3.Apply oil resistant flexible sealant onto compres- sion fitting thread before installing fitting into fryer vessel.

4.Position bent portion of bulb against far right heat transfer tube and install compression fitting snugly into fryer vessel.

5.Adjust bulb so at least 2” of bent portion of it is next to heat transfer tube and tighten compres- sion nut onto compression fitting for fryer 10x11, 18 & up. The end of thermostat bulb should touch the burner tube for 14" fryers.

6.Replace burners.

7.Replace control panel back.

8.Slide back fabric shield over capillary and care- fully coil capillary. Avoid crimping.

9.Reconnect wires to thermostat body.

10.Replace two screws which hold thermostat body to control panel.

11.Replace control panel.

12.Replace three retaining screws and washers which hold dial plate in place.

13.Replace thermostat knob.

14.Connect electric power source. Turn on gas and pilots.

15.Boil out fryer.

16.Refill fryer with oil to “fill level line”.

17.Start fryer, preheat and calibrate with thermometer.

“KEATING” ELECTRONIC TIMER (PART # 023709)

HOW TO PROGRAM THE “KEATING”

ELECTRONIC TIMER

Make certain power to the timer has been OFF for at least 30 seconds. Then PRESS and hold down the UP arrow but- ton while turning the rocker power switch to the ON posi- tion.

Note: If power switch does not turn off timers, the unit must be unplugged (two people may be needed).

The timer will turn ON and the display will now be indicating

 

 

 

– – –

 

– –

 

OR

The BEEPER will BEEP 4 times.

If STEP 1 was OK, proceed to STEP 2. If not, retry Step 1 making sure the power was OFF for at least 30 seconds or more.

10

Image 12 Contents
Contents InstallationOperator Self Help Check List Preventative Maintenance Warranty RepairsFor Your Safety If Equipment Arrives Damaged Minimum ClearanceSuitable for Combustible Floors Venti Lation Installation Flexible GAS Connectors and Quick DIS Connect DevicesGAS Connections and Pipe Size Restraining DevicesLeveling FillingAA Models Operating Instructions START-UP Procedure BB Models Operating Instructions START-UP ProcedureDo BI-MONTHLY TS Models Operating Instructions START-UP Procedure High Limit Test Procedure do BI-MONTHLYShutdown Procedure CookingCleaning and BOIL-OUT for a Single Fryer Shutdown InstructionsOIL Breakdown DrainingSafe & Easy Filter Side View Do not MIX Water and HOT OILOccurrence Solution Operator Self HelpPreventive Maintenance Chart Time OPERATOR/OWNER Frame Qualified ServiceHI-LIMIT Check BI-MONTHLY Thermostat CalibrationKeating Electronic Timer HOW to Program the Keating Checking Continuity with the MultimeterOptional Timer Operating Instructions Ordering PartsControl Panel AA GAS Control Panel BB GAS Control Panel TS GAS DescriptionQTY.DESCRIPTION QTY. DescriptionElectrical BOX Assembly GAS Fryer POT Assembly 14AA GASPOT Assembly 14BB & 14TS GAS POT Assembly 18AA GASPOT Assembly 18BB & 18TS GAS POT Assembly 20AA GASPOT Assembly 20BB & 20TS GAS POT Assembly 24BB & 24TS GASAA2000 Electrical Assembly BB2000 Electrical AssemblyTS2000 Electrical Assembly BB Electrical Assembly with SE FilterPage Problem Probable Cause Solution Page Service Information Keating Limited Warranty Card
Related manuals
Manual 20 pages 4.28 Kb