Installation Procedure
Refrigerant piping
6. Piping and indoor unit vacuumizing
Use vacuum pump to perform vacuumizing. It is strictly forbidden to use the refrigerant to remove the air inside the system.
After air tightness test and discharging all the nitrogen, connect the vacuum pump
as the following figure shown.Low pressure peizometer
High pressure peizometer
Indoor | Outdoor |
| Meter separator | |
(Gas side) | V L VH | |||
Completely tightened | Flare part |
|
|
|
| Discharging valve |
|
| |
|
|
|
| |
|
|
| P |
|
Completely tightened | Flare part |
| Vacuum pump |
Indoor units
Outdoor units
It shall use the vacuum pump of (lower than
The vacuumizing time depends on the length of the connecting pipe, generally is 1~2 hours. When vacuumizing, it shall be confirmed both gas and liquid side valves are closed.
If after 2 hours vacuumizing, it cannot reach the vacuum degree below
If after 3 hours vacuumizing, it still cannot reach the vacuum degree below
If after over 2 hours vacuumizing, the vacuum degree is below
After finishing the above vacuumizing, change the vacuum pump into refrigerant pump to charge the refrigerant.
7. Charging amount of refrigerant
When the total length (L) of the two indoor units' connecting pipe is less than 5m, it is unnecessary to charge additional refrigerant.
If the connecting pipe (L) exceeds 5m, it shall charge Mg additional refrigerant per meter. That is: Refrigerant charging amount =
For AU182AEEAA, M=30
For AU242AGEAA, AU282AHEAA, AU28NAHEAA, AU362AIEAA, AU36NAIEAA , AU48NAIEAA, AU60NAIEAA, M=65
Only in COOLING operation can charge the additional refrigerant.
When charging, the refrigerant shall be charged from the charging nozzle of low pressure vavle.
Be carefull when charging refrigerant, do not let the air mix into the system,and must charge the additional refrigerant in liquid condition.