Haier AU282AHEAA, AU36NAIEAA, AU60NAIEAA, AU362AIEAA, AU48NAIEAA Installation of outdoor unit

Page 6

Installation Procedure

Installation of outdoor unit

 

 

3.Installation of outdoor unit

(1)Installation

Fix the unit in a proper way according to the condition of a place where it is installed by referring to the following .

AU182AEEAA

 

(a) Concrete foundation

(b) Foundation anchor

Unit

Anchor bolt

Concrete foundation

To fix by bolts

Unit

Concrete foundation Anchor bolt

AU242AGEAA

 

(a) Concrete foundation

(b) Foundation anchor

Unit

Anchor bolt

Concrete foundation

To fix by bolts

AU282AHEAA AU28NAHEAA

Unit

Concrete foundation Anchor bolt

(a) Concrete foundation

(b) Foundation anchor

 

Unit

Unit

 

Anchor bolt

 

Concrete foundation

 

 

Concrete foundation

To fix by bolts

Anchor bolt

AU362AIEAA AU36NAIEAA AU48NAIEAA AU60NAIEAA

(a) Concrete foundation

(b) Foundation anchor

Anchor bolt

Unit

Concrete foundation

To fix by bolts

Unit

Concrete foundation

Anchor bolt

Note: (1) Give enough room for the concrete foundation to fix by anchor bolts.

(2) Place the concrete foundation deep enough.

Install the unit so that the angle of inclination must be less than 3 degrees.

5

Image 6
Contents Room AIR Conditioner Name of Parts Air inlet Air outlet CompressorSafety Cautions Installed electrical-leaking circuit breaker Installation Procedure AccessoriesSelection of the place of installation Installation of outdoor unit InstallationInstallation sketch of outdoor unit Refrigerant piping Outline pipingRefrigerant piping Piping size Piping connectionAir discharging method Refrigerant pipingPiping and indoor unit vacuumizing Electric wiring Electric wiringWiring connection Wiring procedure For AU182AEEAABefore starting test run for all Heat pump models Test runHaier Group