Installation
Installation
Read instruction manual 312350 BEFORE installing this product.
•Be sure unit is securely mounted before operation.
•Do not lift pressurized equipment.
Grounding (for non-mobile installation)
(See FIG. 3 below)
1.Loosen grounding lug locknut (A) and washer (B).
2.Insert one end of a 12 gage (1.5 mm2) minimum ground wire (C) into slot in lug (D). Tighten locknut securely.
3.Connect other end of wire to true earth ground. To order a ground wire and clamp, order part number 222011.
B | C |
| A |
| D |
ti0720
FIG. 3
Pump Module
(See FIG. 4, page 8)
Mount Reservoir (P) on sturdy, flat surface with 6 (six),
•The hydraulic system must be depressurized before con- necting High Pressure Hydraulic Lines (A).
•Be sure Breather (M) is not plugged before filling Reser- voir (P).
CAUTION
The hydraulic supply must be 10µ filtered or better and sup- ply 0.5 - 3.0 gpm (1.9 - 11.4 lpm) at 300 psi - 3500 psi (21 bar - 241 bar (2.1 MPa - 24 MPa).
1.Install Ball Valve (AA) (user provided) in the
2.Connect the
(X) to the High Pressure Hydraulic Connection swivel (Y).
3.Connect the
4.Connect the 24 VDC timer controlled signal to the
5.Connect High Pressure Lubricant Supply Line (G) to the Lubricant Output Connection (C) for Single Line Parallel Systems or to Pressure Relief Kit Output Connection for Single Line, Series
6.Ground system (see GROUNDING). Mount Reservoir (P) to grounded chassis member.
Vent Valve Kit for Custom Tank Installation
(Unless otherwise indicated, see FIG. 5 and FIG. 6, page 9)
1.Weld the bracket (FIG. 7, page 10) in place per recommended configuration for mounting the vent valve. Paint the bracket if desired.
2.Connect the Hydraulic Control Line (A) to control module Vent Valve Hydraulic Control (J).
3.Connect Pump Output Connection line (C) to Pump outlet.
4.Connect the High Pressure Lubricant Supply Line (G, FIG. 4, page 8) feeding the injector system to the Lubricant Output (E).
5.Connect the Vent Line (F) to Custom Tank (user provided).
6 | 312349G |