Bard R-410A manual Top

Page 5

Slab Mounting at Ground Level

 

 

 

 

 

The distance between

Air Outlet

 

 

Side

 

 

 

 

 

 

 

 

View

 

 

 

 

 

 

 

 

 

 

 

 

1 inch clearance

 

 

outside wall and unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

varies with installation

 

 

 

 

 

 

 

between duct and

 

 

 

 

 

 

 

 

 

 

 

requirements.

 

 

 

Package Unit

 

 

any combustible

 

 

 

 

 

 

 

material if distance

 

 

 

 

 

 

 

 

 

 

 

between outside

Supply Duct

 

 

 

 

 

 

 

 

 

wall and unit is less

 

 

 

 

 

 

 

 

 

than 3 feet (needed

 

 

 

 

 

 

 

 

 

 

 

on electric heat

 

 

 

 

 

 

 

Mounting Slab

 

 

units only).

 

 

 

 

 

 

 

 

 

 

 

 

Return Duct

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/4 inch per foot

 

 

 

 

 

 

 

 

 

 

slope away

 

 

 

 

 

 

 

 

 

 

from building

 

 

 

 

Building

 

 

 

 

 

Ground Level

 

 

Airflow & Service Access Clearances

 

 

 

 

 

 

 

 

 

 

 

Nearest Structure

 

 

Top

 

 

 

 

 

 

 

 

 

Compressor

 

 

 

 

 

Heater Package

Control Panel

 

View

 

 

 

 

 

Access

36" min.

Access

 

 

 

 

 

 

 

Access

 

 

 

 

 

 

 

 

Heater Package

Control Panel

 

 

24" min.

 

 

 

 

 

 

 

 

 

Comp-

 

 

 

 

 

Building

DuctsReturnand

 

 

 

 

InletAir

StructureNearest

 

 

 

 

 

 

ressor

 

 

 

 

 

 

Blower

 

 

 

 

 

 

 

 

 

 

 

and

 

 

 

 

 

 

 

 

 

 

Supply

Blower Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Condenser fan

 

 

 

 

 

 

 

 

 

 

and motor access

 

 

 

 

 

Blower Service

 

 

 

 

from top.

 

 

 

 

 

 

24" min.

 

 

 

Leave 60" min.

 

 

 

 

 

 

Access

 

 

 

above fan.

 

Page

Supersedes

FormNo.

 

 

 

 

 

 

 

 

 

 

 

Air Inlet

 

 

 

 

 

 

 

 

 

 

Nearest Structure

 

 

MIS-2143 A

 

 

 

 

 

 

 

 

 

 

5 of 8

S3383-510

S3383-1112

 

 

 

 

 

 

 

 

 

Elevated Mounting Platforms (Field Constructed)

12" min. if in

Platform can be as

32°F or lower climate

shown or solid

48" min.

Both legs must rest

on surface of platform

Poured concrete,

 

brick, or block

 

12" min. if in

 

32°F or lower climate

 

48" min.

Metal frame

Both legs must rest

on surface of platform

 

 

 

MIS-2144 A

Image 5
Contents Field Installed Accessories Standard Engineered FeaturesIndoor Blower Performance General SpecificationsCooling Capacities and Efficiency Ratings Optional Field Installed Electric Heater through 5 Ton Optional Field Installed Electric Heater PackagesCooling Application Data Outdoor Temperature Top Field Installed Part Applicable To Description Unit DimensionsOptional Control Modules Field Installed Model No Applicable To Optional Equipment Roof HoodVentilation Rate Optional Equipment Energy Recovery VentilatorWHR WHR WVL
Related manuals
Manual 16 pages 56.39 Kb