Lincoln Electric IM679-A manual Operation, Duty Cycle, Volt Meter, Output Control

Page 12

B-1

 

OPERATION

 

B-1

 

 

 

 

 

SAFETY PRECAUTIONS

WARNING

ELECTRIC SHOCK can kill.

• Do not touch electrically live parts or electrode with skin or wet clothing.

Insulate yourself from work and ground.

Always wear dry insulating gloves.

------------------------------------------------------------------------

FUMES AND GASES can be danger-

ous.

Keep your head out of fumes.

• Use ventilation or exhaust to remove

fumes from breathing zone.

------------------------------------------------------------------------

WELDING SPARKS can cause fire or explosion.

Keep flammable material away.

Do not weld on closed containers.

------------------------------------------------------------------------

ARC RAYS can burn eyes and skin.

Wear eye, ear and body protection.

------------------------------------------------------------

See additional warning information at front of this operator’s manual.

-----------------------------------------------------------

GENERAL DESCRIPTION

The Invertec V350-Pro offers multi-process CV, CC, and DC welding and is rated 350 amps, 34 volts at a 60% duty cycle. The V350-Pro is available in several versions of wire feeder connections. In the different configurations, the V350-Pro is available in either a Construction version (no wire feeder connection and auxiliary power) and a Factory & Advance Process versions (includes wire feeder connection and related power).

DUTY CYCLE

The V350-Pro is rated at 350 amps, 60% duty cycle (based on a 10 minute cycle). It is also rated at 275 amps, 100% duty cycle.

OPERATIONAL FEATURES and CONTROLS:

UPPER CONTROL PANEL 1. AMPS Meter

Prior to STICK or TIG operation (current flow), the meter displays preset current value (either 2 amps or +/- 3% (e.g. 3 amps on 100), whichever is greater).

Prior to CV operation, the meter displays four dash- es indicating non-presettable AMPS.

During welding, this meter displays actual average amps.

After welding, the meter holds the actual current value for 5 seconds. Output adjustment while in the "hold" period results in the "prior to operation" char- acteristics stated above. The displays blink indicat- ing that the machine is in the "Hold" period.

2. VOLT METER

Prior to CV operation (current flow), the meter dis- plays desired preset voltage value (+/- .5V).

Prior to STICK or TIG operation, the meter displays the Open Circuit Voltage of the Power Source or four dashes if the output has not been turned on.

During welding, this meter displays actual average volts.

After welding, the meter holds the actual voltage value for 5 seconds. The displays blink indicating that the machine is in the "Hold" period.

Output adjustment while in the "hold" period results in the "prior to operation" characteristics stated above.

3. OUTPUT CONTROL

Output control is conducted via a single turn poten- tiometer.

Adjustment is indicated by the meters as stated above.

When in TIG modes, this control sets the maximum welding current. Full depression of a foot or hand Amptrol results in the preset level of current.

4. WELD TERMINALS-REMOTE / ON

Two status lights indicate the location of trigger con- trol as determined by the "WELD TERMINALS" push button.

If trigger control is local "weld terminals on", the ON display will be lit.

If trigger control is remote "weld terminals remotely controlled", the REMOTE display will be lit.

The unit will power up in "pre-determined preferred" trigger modes.

For the Construction version all modes ON. For the Factory and Advanced Process version

STICK = ON

TIG and CV = ON or REMOTE depending if remote output controls are connected to the machine.

V350-PRO

Image 12
Contents Invertec V350-PRO Safety California Proposition 65 WarningsElectric Shock can kill Welding Sparks can cause fire or explosion IiiPrécautions DE Sûreté Thank You Table of Contents Installation V350-PRO Safety Precautions Connections of Wire Feeders to V350-PRO Select Suitable Location Remote Control of Invertec Undercarriage MountingsParallel Operation Quick Disconnect PlugsOperation Duty CycleVolt Meter Output ControlWeld Mode Select Factory and Construction See Figure ThermalCONTROL-REMOTE / Local Operation 7A. Advanced Process Panel Welding Process Modes Availiable Electrode MaterialExample of Saving Welding Modes to Memory Weld Mode Details Gmaw CVLN-10/DH-10 Wire Feeder Compatibility Note Pulse ProgramsLower Case Panel Weld TerminalsDesign Features and Advantages Auxiliary PowerLimitations Recommended ProcessesAccessories Options / Accessories Construction Version K1728-2Field Installed Options Advanced Process Version K1728-4Maintenance Capacitor Discharge ProcedureRoutine Maintenance Periodic MaintenanceTroubleshooting HOW to USE Troubleshooting GuideSymptoms Authorized Field ServicePossible Areas Contact your Local LincolnContact your local Lincoln Authorized Field Service Facility CPU Displays Description Scrolling dash Diagrams Remote Control AdaptersK867 Plug to LN-7 Connection Diagram K867 Plug to LN-25 Connection Diagram K867 Universal Adapter / Invertec Connection Diagram K876 Adapter to LN-25 Connection Diagram K864 Adapter to LN-7 & Remote Control Connection Diagram Wiring Diagram Invertec V350-PRO Dimension Print V350-PRO V350-PRO Precaucion Warnung