MAINTENANCE | |||
4.68 | (119 mm) |
| |
GAS PLUG | PRESS HERE TO | CONNECTOR COVER | |
REMOVE THE CABLE | |||
OR FITTING |
| ||
HANDLE NUT |
| ||
FEEDER END |
| ||
|
| ||
CONNECTOR |
| CABLE BOOT | |
|
| ||
|
| CABLE |
CABLE HANDLE NUT
TAIL PIECE
.43 (11 mm) MAX.
CABLE HANDLE
STRAIN RELIEF HOUSING
STRAIN RELIEF
INCOMING
CONNECTOR
Figure 5
f.Check that the cable boot and cable handle are on the cable. Slip the connector nut over the copper strands with the threaded end out. Assemble incoming connector to cable by forcing the steel tube of the connector into the inside diameter of the cable inner tube until the copper strands are butted against the incoming connector shoulder. Keeping the copper strands against the shoulder, pull the connector nut over the copper strands, engage the incoming connector threads, and tight- en in place. Refer to Figure 3.
NOTE: For best results, insert a .219"/.240" (5.6/6.1 mm) diameter rod through the connector and into core of cable approximately 5.00” (127
mm)when pushing the connector tube into the cable core tube. To tighten, hold the connector in place while turning the nut. then remove the rod from the core. This procedure ensures the inner core does not kink while assembling or tightening.
Position the plastic strain relief such that the tapered end is 4.68 (119 mm) from the incoming connector (see Figure 5). Lock into place with steel housing. Plastic strain relief may overhang cable jacket a maximum of .43" (11 mm).
g.Position cable boot and cable handle on cable and assemble replacement control wire terminals in place on the cable handle. Insert connector cover in place. Install tailpiece and fasten to cable handle with cable handle nut. Refer to Figure 5.
h.Replace the molded gas plug (or barbed fitting) and feeder end connector.
j. Install and trim liner per Liner Installation Section.
MAGNUM 300 & 400