Lincoln Electric SA-250 Purging AIR from Fuel System Perkins 104-22 Engine, Idler Maintenance

Page 18

D-2

MAINTENANCE

D-2

 

 

 

Lincoln brushes have a curved face to fit the commu- tator. Have an experienced maintenance man seat these brushes by lightly stoning the commutator as the armature rotates at full speed until contact is made across the full face of the brushes. After stoning, blow out the dust with low pressure air.

To seat slip ring brushes, position the brushes in place. Then slide one end of a piece of fine sandpa- per between slip rings and brushes with the coarse side against the brushes. Pull the sandpaper around the circumference of the rings - in direction of rotation only - until brushes seat properly. In addition, stone slip ring with a fine stone. Brushes must be seated 100%.

Arcing or excessive exciter brush wear indicates a possible misaligned shaft. Have an authorized Field Service Shop check and realign the shaft.

PURGING AIR from FUEL SYSTEM (Perkins 104-22 Engine)

WARNING

Keep fuel clear of open flames or arcs, allow engine to cool before working on the fuel system. Wipe up any spilled fuel and do not start engine until fumes clear.

------------------------------------------------------------------------

If the engine is running rough and you suspect air has been trapped in the fuel system, (EG. the engine was allowed to run out of fuel) perform the following steps using qualified personnel:

1.Loosen by two or three turns, the vent screw (Figure D.1) on the fuel inlet connection.

IDLER MAINTENANCE

CAUTION

Before doing electrical work on the idler printed circuit board, disconnect the battery.

------------------------------------------------------------------------

When installing a new battery or using a jumper bat- tery to start the engine, be sure the battery polarity is connected properly. The correct polarity is negative ground. Damage to the engine alternator and the printed circuit board can result from incorrect connec- tion.

1.The solenoid plunger must work freely and not bind. Dust the plunger about once a year with graphite powder.

2.Proper operation of the idler requires good ground- ing of the printed circuit board, reed switch, and battery.

3.Idler solenoid is activated for high idle.

4.If desired, the welder can be used without automat- ic idling by setting the “Idler” switch to the “High” position.

NAMEPLATES

Whenever routine maintenance is performed on this machine - or at least yearly - inspect all nameplates and labels for legibility. Replace those which are no longer clear. Refer to the parts list for the replace- ment item number.

Vent Screw

Priming

Lever

FIGURE D.1

2.For Engines Equipped with a mechanical fuel pump:

Operate the priming lever on the fuel lift pump until fuel, free of air, flows from the vent point. Tighten the vent screw. If the pump is at the point of maxi- mum lift, it will not be possible to operate the prim- ing lever. If this occurs, turn the crankshaft one revolution.

For Engines Equipped with an electric fuel pump:

Operate the electric fuel pump by turning the “Ignition” switch “ON” until fuel, free of air, flows from the vent point. Tighten the vent screw.

3.Contact your Perkins Engine repair facility if prob- lems persist.

SA-250

Image 18
Contents SA-250 Safety California Proposition 65 WarningsElectric Shock can kill Welding Sparks can cause fire or explosion IiiPrécautions DE Sûreté Sûreté Pour Soudage a L’ArcThank You Please Examine Carton and Equipment For Damage ImmediatelyTable of Contents Height Width Depth Weight InstallationTechnical Specifications SA-250 K1283-8 AIR Cleaner Engine Idler Muffler Engine ProtectionLocation / Ventilation PRE-OPERATION InstallationExhaust Spark Arrester Machine GroundingOIL PRE-OPERATION ServicePolarity Control and Cable Sizes FuelTo prevent Explosion when 4INSTALLATIONA-4Battery Charging To prevent Electrical Damage whenGeneral Description Safety PrecautionsOperation Control PanelStarting the SA-250 Perkins Engine OperationCold Weather Starting Diesel EngineWelder Operation Control of Welding CurrentIdler Operation Auxiliary Power Accessories Optional Features Field InstalledWater Valve Kit K844-1 SA-250 Maintenance MaintenanceNameplates Idler MaintenancePurging AIR from Fuel System Perkins 104-22 Engine Vent Screw Priming LeverEngine Service Troubleshooting HOW to USE Troubleshooting GuideWelder Troubleshooting Authorized Field Service FacilityContact your local Lincoln Engine Troubleshooting Contact your local Lincoln Authorized Field Service FacilityFaulty Charging Loose fan belt Electronic Idler Troubleshooting Guide Open ClosedAuxiliary Power Load is Turned on Defective -- Will Not CloseSA-250 Wiring Diagram DiagramsDimension Print SA-250 SA-250 Need Welding Training? How To Read Shop DrawingsNew Lessons in Arc Welding Basic CoursePrecaucion Warnung