Friedrich 60, 24, 18, 49, 36, 42, 30, 000 operation manual Installation

Page 1

INSTALLATION

&

OPERATION MANUAL

Single Package

Vertical Air Conditioning System

B – Series

18,000 – 24,000 – 30,000 – 36,000 –

42,000 – 49,000 – 60,000 Btuh

840-170-38

Image 1
Contents Installation Table of Contents Supplies Needed for Installation Safety ConsiderationsGeneral Recommendations DOS and Donts Unpack and Inspect UnitVERT-I-PAKMODEL Identification Guide Section I General SpecificationsCondensate Drain Exit Above Floor Section III Installation Indoor and Outdoor AIR Requirements Unit ConfigurationOutdoor Air System VPBWP4 8/14 Wall Plenum VPBWP3 8/14 Wall PlenumVPBWP6 8/14 Wall Plenum VPBWP5 8/14 Wall PlenumDucted Condenser Air Typical Ducted Outside Air ConfigurationOutdoor Fan Performance Indoor Fan Performance Indoor-Air Conditioned Supply Air SystemReturn Air Options Cooling and Fan Electrical Grounding Power SupplyThermostat Mounting and Wiring Thermostat Mounting and Wiring A. Thermostat LocationWire Thermostat Cable to Unit Terminal Strip Thermostat WiringTest Run Installation Final ChecklistImportant Facts Identifying Your SystemOperating the VERT-I-PAK Thermostat Operation Heat Mode OperationHeating Cycle Cooling CycleDefrost Cycle Replace AIR Filter Performing Routine MaintenanceInspect and Clean Condensate Drain Inspect and Clean INDOOR-AIR CoilInspect OUTDOOR-AIR Intake and Exhaust Use Factory-Certified Parts