Texas Instruments BQ24450EVM Procedure, Pre-charge, Max Charge, Charge Termination, Re-Charge

Page 4

Procedure

www.ti.com

Replacement circuit for a 3-cell lead acid battery. BAT+ to BAT– voltage tracks the power supply input voltage, minus 1 diode drop

Figure 2. Battery Load Circuit – PR1010-2

4 Procedure

4.1Pre-charge

Turn on PS #1, preset to 10 VDC. Verify voltage on VM #1. Turn on PS #2, preset to 5.2 VDC.

Adjust PS #2 such that VM #2 shows 5 VDC.

Using VM #3, measure the voltage across the current sense resistor on Load #1. Multiply this value by a conversion factor of 10A/V. This is the pre-charge current.

4.2Max Charge

Adjust PS #2 such that VM #2 shows 6 VDC.

Using VM #3, measure the voltage across the current sense resistor on Load #1. Multiply this value by a conversion factor of 10A/V. This is the max charge current.

4.3Charge Termination

Adjust PS #2 such that VM #2 shows 7.5 VDC. There should be no charge current in this condition.

4.4Re-Charge

Adjust PS #2 such that VM #2 shows 6 VDC.

Using VM #3, measure the voltage across the current sense resistor on Load #1. Multiply this value by a conversion factor of 10A/V. This is the max charge current.

4

bq24450EVM

SLUU464 –November 2010

 

 

Submit Documentation Feedback

© 2010, Texas Instruments Incorporated

Image 4
Contents Bq24450EVM EVM Features IntroductionGeneral Description I/O Description and Jumper FunctionsPower Supplies Recommended Operating ConditionsLoads MetersProcedure Pre-chargeMax Charge Charge TerminationChanging Output Voltage and Charge Current Functions and FeaturesQ1 and the surrounding area of the PCB may become hot Other Options Options for External TransistorPCB Layout Guideline Bill of Materials, Board Layouts and Schematic Bill of MaterialsBill of Materials Reference Value Description Size Part NumberTop Assembly Layer Board LayoutSchematic Bottom PCB LayerFCC Warning Evaluation Board/Kit Important NoticeEVM Warnings and Restrictions Important Notice Products Applications