Industry Automation and Drive Technologies - SCE
1 PREFACE
Regarding its content, Module E12 is part of the instruction unit ’IT Communication with S7’.
Fundamentals of
STEP7 Programming
2 to 3 days Modules A
Programming
Languages
2 to 3 days Modules C
Additional Functions of STEP7 Programming
2 to 3 days Modules B
Industrial Fieldbus
Systems
2 to 3 days Modules D
System Simulation with SIMIT SCE
1 to 2 days Modules G
Process
Visualization
2 to 3 days Modules F
Frequency Converter at SIMATIC S7
2 to 3 days Modules H
IT Communication with SIMATIC S7
2 to 3 days Modules
E
Objective
In Module E12, the reader learns how networking and data exchange between PLCs and the vision sensor evaluation device VS120 is set up.
As PLC, the CPU
Module E12 shows in principle the procedure for the startup, based on a brief example.
.
Prerequisites
To successfully work through Module E12, the following knowledge is assumed:
•How to handle Windows
•Fundamentals of PLC programming with Step7 (for example, Module A3 ‘Startup’ PLC Programming with STEP7)
•Fundamentals of network engineering (for example: Appendix V – Basics of Network Engineering)
TIA Training Document | Page 5 of 47 | Module |
E12 |
|
|
Status: 01/2010 | Vision Sensor Shape Check with SIMATIC |